Summary for Test 2020-09-08-25-3
Test performed: ASTM D5329-16Project Information
Project Identifiers | Project ID: 214605 DEA: 051K7904 EFIS: 0519000026 |
---|---|
DIST-CO-RTE-PM | 05-SB-166-R51.1/55.0 |
Award Date | 02/26/2020 |
Closeout Date | 08/23/2021 |
Work Description | COLD IN-PLACE RECYCLING AND RHMA OVERLAY. |
Location Description | SANTA BARBARA COUNTY ABOUT 10 MILES WEST OF NEW CUYAMA FROM CUYAMA RIVER BRIDGE TO 3.1 MILES EAST OF COTTONWOOD CANYON ROAD |
QA Service Level | 1 (Verified on 04/08/2020) |
Sample Information
Sample Taken Date | 09/08/2020 | Sample Unique Key | 25 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 09/21/2020 |
Sample type | Department Acceptance | A brief description of the sample | ARB #5 test, #6(200909E), #7(200910E) No Test |
The quantity of what the sample constitutes | 1can | From where was the sample collected | Source |
First name of sampler or witnessed by | Mark | Last name of sampler or witnessed by | Bennett |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Cal Portland Garey Plant | Transportation Laboratory (TL) Number | 200908E |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Asphalt Rubber Binder | Asphalt modifier supplier | |
---|---|---|---|
Performance Grade | PG 64-16 | Lot number | |
Sublot number | Asphalt Rubber Binder Mix Number | Not set |
Test Details
DIME Sample ID: 2020-09-08-25
DIME Test ID: 2020-09-08-25-3
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: ASTM D5329-16: Standard Test Methods for Sealants and Fillers, Hot-Applied, for Joints and Cracks in Asphalt Pavements and Portland Cement Concrete Pavements (Asphalt Pavement)
Test Release Date: 2020-09-25
Test Results
Input Type: Measured
Tester's full name: Minoo Ahmadi
Date of test: 09/24/2020
Temperature: 25 C
Final Dial reading (F1): 80 mm
Ball Penetration (P1): 0 mm
Final Dial reading (F2): 80 mm
Ball Penetration (P2): 0 mm
Final Dial reading (F3): 84 mm
Ball Penetration (P3): 0 mm
Resilience 1: 20 %
Resilience 2: 20 %
Resilience 3: 16 %
Average Resilience: 19 %
Minutes Reaction: no data
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 9/25/2020 ✔