Summary for Test 2020-06-10-45-1
Test performed: AASHTO T308-10Project Information
Project Identifiers | Project ID: 214685 DEA: 024E46U4 EFIS: 0216000122 |
---|---|
DIST-CO-RTE-PM | 02-LAS-36-6.0/14.6 |
Award Date | 05/08/2020 |
Closeout Date | 08/14/2023 |
Work Description | REPLACE BRIDGE, ROADWAY EXCAVATION, HMA, CLASS 2 AB AND DRAINAGE WORK. |
Location Description | LASSEN COUNTY NEAR WESTWOOD FROM 1.3 MILES WEST OF GOODRICH CREEK BRIDGE TO 1.0 MILE WEST OF WILLARD CREEK ROAD |
QA Service Level | 1 (Verified on 03/02/2020) |
Sample Information
Sample Taken Date | 06/10/2020 | Sample Unique Key | 45 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 06/11/2020 |
Sample type | Verification | A brief description of the sample | 3/4-inch Type A HMA (eq. PG 64-28 M) |
The quantity of what the sample constitutes | JMF Verification | From where was the sample collected | Manufacturer |
First name of sampler or witnessed by | CGI | Last name of sampler or witnessed by | CGI |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | D78466 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | Ward Lake Plant | Transportation Laboratory (TL) Number | 896982 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Hot Mix Asphalt | HMA Type | Type A HMA |
---|---|---|---|
HMA Grading | 3/4 inch | Lot number | |
Sublot number | HMA Mix Number | Not set |
Combined Gradation Report Information
Combined Gradation Report Id | Bin Index | Dime Test Id |
---|---|---|
No assigned tests for this sample. |
Test Details
DIME Sample ID: 2020-06-10-45
DIME Test ID: 2020-06-10-45-1
Testing Lab: CT D02 - Redding Northern Regional Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2020-09-10
Test Results
What temperature unit is used?: Fahrenheit
Input Type: Calculated
Tester's full name: Ward Jenkins
Date of test: 06/26/2020
Test procedure used?: Method A
Mass of HMA Sample prior to ignition: 2090.4 g
Mass Loss: no data
Correction Factor (Percent by mass of HMA Specimen): 0.54 %
Moisture Content: 0.00 %
Temperature Compensation Factor: no data
Test Temperature: 1000 F
Corrected Asphalt Binder Content: 6.39 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 9/10/2020 ✔