Summary for Test 2020-08-17-27-4

Test performed: AASHTO T269-14

Project Information

Project IdentifiersProject ID: 214388
DEA: 051F6804
EFIS: 0514000046
DIST-CO-RTE-PM05-MON-1-39.8/74.6
Award Date11/05/2019
Closeout Date08/17/2022
Work DescriptionRHMA OVERLAY ON EXISTING ROADWAY AND REPLACE GUARDRAIL.
Location DescriptionMONTEREY COUNTY FROM TORRE CANYON BRIDGE NEAR BIG SUR TO SAN LUIS AVENUE IN CARMEL
QA Service Level1 (Verified on 09/06/2019)

Sample Information

Sample Taken Date08/17/2020 Sample Unique Key27
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing08/27/2020
Sample typeVerification A brief description of the sampleBoxes of RHMA-G
The quantity of what the sample constitutesOne JMF Renewal From where was the sample collectedManufacturer
First name of sampler or witnessed byJ Last name of sampler or witnessed byGomez
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameGraniterock Aromas Batch Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeHot Mix Asphalt HMA TypeRHMA-G
HMA Grading1/2 inch Lot number
Sublot number HMA Mix NumberNot set

Test Details

DIME Sample ID: 2020-08-17-27
DIME Test ID: 2020-08-17-27-4
Testing Lab: CT D05 - San Luis Obispo District Laboratory
Test Method: AASHTO T269-14: Standard Method of Test for Percent Air Voids in Compacted Dense and Open Asphalt Mixtures (Air Void)
Test Release Date: 2020-08-31

Test Results


Number of tests: 3
Input Type: Calculated
Tester's full name: Various
Date of test: 08/27/2020
Percent Air Voids: 3.6 %
Percent Air Voids 2: 4.3 %
Percent Air Voids 3: 4.3 %
Percent Air Voids Average: 4.1 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 8/31/2020