Summary for Test 2020-08-07-19-1

Test performed: CTM 308-August 2010

Project Information

Project IdentifiersProject ID: 212618
DEA: 044G0564
EFIS: 0417000154
DIST-CO-RTE-PM04-ALA-680-M2.4/M12.4
Award Date11/16/2017
Closeout Date12/08/2022
Work DescriptionROADWAY REHAB, BRIDGE REPLACEMENT, RET. WALLS, TOLL SYSTEMS
Location DescriptionFREMONT AND AT SUNOL FROM MISSION BOULEVARD SEPARATION TO KOOPMAN ROAD UNDERCROSSING
QA Service Level1 (Verified on 10/16/2017)

Sample Information

Sample Taken Date08/07/2020 Sample Unique Key19
Will the laboratory/organization for which you are a member perform testing on this material sample?No Date that the sample was received by the laboratory/organization performing the testingNot set
Sample typeVerification A brief description of the sample1/2" WRHMA-O-SP
The quantity of what the sample constitutes2 cans From where was the sample collectedFabricator
First name of sampler or witnessed byDennis Last name of sampler or witnessed byYeung
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameHanson Sunol Plant Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeHot Mix Asphalt HMA TypeOGFC
HMA Grading1/2 inch Lot number
Sublot number HMA Mix NumberNot set

Test Details

DIME Sample ID: 2020-08-07-19
DIME Test ID: 2020-08-07-19-1
Testing Lab: CT D04 - Hayward DME / District Laboratory
Test Method: CTM 308-August 2010: Method of Test for Determining Bulk Specific Gravity and Density of Compacted Hot Mix Asphalt (Method B)
Test Release Date: 2020-08-18

Test Results


Aggregate Size: 1/2-inch
Input Type: Measured
Tester's full name: Reza Dineli
Date of test: 08/12/2020
Height of Briquette: 1.06 in.
Bulk Specific Gravity: 1.832
Density: 114.0 lb/ft^3
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 8/18/2020