Summary for Test 2020-07-01-21-1
Test performed: AASHTO T240-17Project Information
Project Identifiers | Project ID: 214571 DEA: 020J1104 EFIS: 0219000062 |
---|---|
DIST-CO-RTE-PM | 02-PLU-70-33.1/42.1 |
Award Date | 02/07/2020 |
Closeout Date | 04/27/2021 |
Work Description | PLACE HMA & SHOULDER BACKING, & REMOVE & REPLACE PAVEMENT DELINEATION. |
Location Description | PLUMAS COUNTY AT AND NEAR KEDDIE FROM INDIAN CREEK BRIDGE TO 0.3 MILE WEST OF SPANISH CREEK BRIDGE NO. 09-0018 |
QA Service Level | 1 (Verified on 01/22/2020) |
Sample Information
Sample Taken Date | 07/01/2020 | Sample Unique Key | 21 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 07/07/2020 |
Sample type | Acceptance | A brief description of the sample | Modified Asphalt Binder |
The quantity of what the sample constitutes | 1 Can, #1 TEST | From where was the sample collected | Source |
First name of sampler or witnessed by | Joe | Last name of sampler or witnessed by | Joe |
Title of sampler | PEI | Telephone number of sampler | |
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Albina | Transportation Laboratory (TL) Number | 734740 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Asphalt Binder | Performance Grade | PG 64-28 M |
---|---|---|---|
Modified | Yes | Lot number | 0 |
Sublot number | 0 | Tank number | Not set |
Time of sample | Not set | HMA Supplier | Not set |
Certified Asphalt Supplier | Not set | Multigrade | Not set |
Multigrade Type | Not set | Asphalt Binder Mix Number | Not set |
Test Details
DIME Sample ID: 2020-07-01-21
DIME Test ID: 2020-07-01-21-1
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2020-09-23
Test Results
Is mass change based on one or two containers?: One
Input Type: Measured
Tester's full name: Ruben Macias
Date of test: 07/30/2020
Any material loss from containers during heating process/testing?: No
Mass of empty container #1: 169.870 grams
Mass of container #1 before test (m1i): 204.580 grams
Mass of container #1 after test (m1f): 204.480 grams
Average mass change: -0.288 percent
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 9/23/2020 ✔