Test performed: CTM 202-November 2011Project Information
Project Identifiers | Project ID: 212779 DEA: 021H5804 EFIS: 0216000024 |
---|---|
DIST-CO-RTE-PM | 02-PLU-70-58.4/R78.4 |
Award Date | Not set |
Closeout Date | Not set |
Work Description | Not set |
Location Description | Not set |
QA Service Level | 1 (Verified on 01/08/2019) |
Sample Information
Sample Taken Date | 09/13/2018 | Sample Unique Key | 9 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 09/14/2018 |
Sample type | Informational | A brief description of the sample | Sand, Silt, Clay |
The quantity of what the sample constitutes | N/A | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Dan | Last name of sampler or witnessed by | Curran |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | D77638 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | Not applicable | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | Not Applicable |
---|---|---|---|
The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
The plant number | A detailed description of where the material sample was collected | Plu 70 PM 74.0 | |
Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | 1/2 inch | |
The concrete mix design number | Lot number | ||
Sublot number | Aggregate Mix Number | Not set |
Test Details
DIME Sample ID: 2018-09-13-9
DIME Test ID: 2018-09-13-9-1
Testing Lab: CT D02 - Redding Northern Regional Laboratory
Test Method: CTM 202-November 2011: Method of Test for Sieve Analysis of Fine and Coarse Aggregates
Test Release Date: 2020-08-18
Test Results
What size aggregate is being tested?: Combined Gradation
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
For Combined Gradation only, has the fine aggregate sample been reduced?: No
For Combined Gradation only, use #40 Sieve?: No
Input Type: Calculated
Tester's full name: Mike Cruz
Date of test: 09/14/2018
Cumulative percent passing the 3 in. sieve: 100 %
Cumulative percent passing the 2 1/2 in. sieve: 100 %
Cumulative percent passing the 2 in. sieve: 100 %
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 100 %
Cumulative percent passing the 1/2 in. sieve: 100 %
Cumulative percent passing the 3/8 in. sieve: 100 %
Cumulative percent passing the #4 sieve: 100 %
Cumulative percent passing the #8 sieve: 99 %
Cumulative percent passing the #16 sieve: 93 %
Cumulative percent passing the #30 sieve: 78 %
Cumulative percent passing the #50 sieve: 62 %
Cumulative percent passing the #100 sieve: 44 %
Cumulative percent passing the #200 sieve: 29.5 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 8/18/2020 ✔