Summary for Test 2020-06-10-33-1
Test performed: AASHTO T240-17Project Information
Project Identifiers | Project ID: 214685 DEA: 024E46U4 EFIS: 0216000122 |
---|---|
DIST-CO-RTE-PM | 02-LAS-36-6.0/14.6 |
Award Date | 05/08/2020 |
Closeout Date | 08/14/2023 |
Work Description | REPLACE BRIDGE, ROADWAY EXCAVATION, HMA, CLASS 2 AB AND DRAINAGE WORK. |
Location Description | LASSEN COUNTY NEAR WESTWOOD FROM 1.3 MILES WEST OF GOODRICH CREEK BRIDGE TO 1.0 MILE WEST OF WILLARD CREEK ROAD |
QA Service Level | 1 (Verified on 03/02/2020) |
Sample Information
Sample Taken Date | 06/10/2020 | Sample Unique Key | 33 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 06/26/2020 |
Sample type | Department Acceptance | A brief description of the sample | TEST Asphalt Binder |
The quantity of what the sample constitutes | JMF, 1 can, #1 Test | From where was the sample collected | Source |
First name of sampler or witnessed by | Unknown | Last name of sampler or witnessed by | Unknown |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | AB206068 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | Marathon | Transportation Laboratory (TL) Number | 896984 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Asphalt Binder | Performance Grade | PG 58-34 M |
---|---|---|---|
Modified | Yes | Lot number | Unknown |
Sublot number | Unknown | Tank number | Not set |
Time of sample | Not set | HMA Supplier | Not set |
Certified Asphalt Supplier | Not set | Multigrade | Not set |
Multigrade Type | Not set | Asphalt Binder Mix Number | Not set |
Test Details
DIME Sample ID: 2020-06-10-33
DIME Test ID: 2020-06-10-33-1
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2020-07-07
Test Results
Is mass change based on one or two containers?: One
Input Type: Measured
Tester's full name: Juan Gomez
Date of test: 07/07/2020
Any material loss from containers during heating process/testing?: No
Mass of empty container #1: 173.6 grams
Mass of container #1 before test (m1i): 208.51 grams
Mass of container #1 after test (m1f): 208.33 grams
Average mass change: -0.516 percent
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 7/7/2020 ✔