Summary for Test 2020-04-15-23-1

Test performed: AASHTO T240-17

Project Information

Project IdentifiersProject ID: 214322
DEA: 021H74U4
EFIS: 0218000043
DIST-CO-RTE-PM02-TEH-36-87.8/89.1
Award Date10/11/2019
Closeout Date09/23/2020
Work DescriptionCURVE REALIGNMENT AND EXTENDING THE TRUCK CLIMBING LANE.
Location DescriptionTEHAMA COUNTY NEAR MINERAL FROM 0.1 MILE TO 1.5 MILES EAST OF ROUTE 89
QA Service Level1 (Verified on 09/16/2019)

Sample Information

Sample Taken Date04/15/2020 Sample Unique Key23
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing06/17/2020
Sample typeDepartment Acceptance A brief description of the sampleTEST Asphalt Binder
The quantity of what the sample constitutes1 can, #1 test From where was the sample collectedSource
First name of sampler or witnessed byC Last name of sampler or witnessed byBryant
Title of samplerTET Telephone number of sampler
Laboratory sample identificationAB206050 Linked DIME Sample ID
The fabricator/manufacturer/facility nameMarathon Transportation Laboratory (TL) Number853430
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeAsphalt Binder Performance Grade PG64-28M
ModifiedYes Lot numberNot set
Sublot numberNot set Tank numberNot set
Time of sampleNot set HMA SupplierNot set
Certified Asphalt SupplierNot set MultigradeNot set
Multigrade TypeNot set Asphalt Binder Mix NumberNot set

Test Details

DIME Sample ID: 2020-04-15-23
DIME Test ID: 2020-04-15-23-1
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2020-07-01

Test Results


Is mass change based on one or two containers?: One
Input Type: Measured
Tester's full name: Juan Gomez
Date of test: 06/29/2020
Any material loss from containers during heating process/testing?: No
Mass of empty container #1: 177.820 grams
Mass of container #1 before test (m1i): 212.650 grams
Mass of container #1 after test (m1f): 212.450 grams
Average mass change: -0.574 percent
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 7/1/2020