Summary for Test 2020-05-21-30-1
Test performed: AASHTO T240-17Project Information
Project Identifiers | Project ID: 214725 DEA: 020J1304 EFIS: 0219000064 |
---|---|
DIST-CO-RTE-PM | 02-LAS-139-43.0/53.0 |
Award Date | 04/10/2020 |
Closeout Date | 10/06/2020 |
Work Description | COLD IN-PLACE RECYCLING AND PLACE HMA (TYPE A). |
Location Description | LASSEN COUNTY ABOUT 42 MILES NORTH OF SUSANVILLE FROM 3.8 MILES NORTH OF SLATE CREEK TO 4.7 MILES SOUTH OF WILLOW CREEK RANCH ROAD |
QA Service Level | 1 (Verified on 03/02/2020) |
Sample Information
Sample Taken Date | 05/21/2020 | Sample Unique Key | 30 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 06/05/2020 |
Sample type | Acceptance | A brief description of the sample | Asphalt Binder |
The quantity of what the sample constitutes | 1 Can, #1 Test | From where was the sample collected | Source |
First name of sampler or witnessed by | J | Last name of sampler or witnessed by | Montana |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | AB206042 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | Albina - Klamath Falls, OR | Transportation Laboratory (TL) Number | 733196 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Asphalt Binder | Performance Grade | PG 58-34 M |
---|---|---|---|
Modified | Yes | Lot number | |
Sublot number | Tank number | Not set | |
Time of sample | Not set | HMA Supplier | Not set |
Certified Asphalt Supplier | Not set | Multigrade | Not set |
Multigrade Type | Not set | Asphalt Binder Mix Number | Not set |
Test Details
DIME Sample ID: 2020-05-21-30
DIME Test ID: 2020-05-21-30-1
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2020-07-01
Test Results
Is mass change based on one or two containers?: One
Input Type: Measured
Tester's full name: Juan Gomez
Date of test: 07/01/2020
Any material loss from containers during heating process/testing?: No
Mass of empty container #1: 173.780 grams
Mass of container #1 before test (m1i): 209.310 grams
Mass of container #1 after test (m1f): 209.190 grams
Average mass change: -0.338 percent
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 7/1/2020 ✔