Summary for Test 2020-06-14-4-1
Test performed: AASHTO T240-17
Warning: The test results shown on this page have been superseded and are invalid.
This information is for reference only.
Project Information
Project Identifiers | Project ID: 213411 DEA: 030H10U4 EFIS: 0317000246 |
---|---|
DIST-CO-RTE-PM | 03-SAC-5-9.7/24.9 |
Award Date | 05/01/2019 |
Closeout Date | 02/22/2024 |
Work Description | Not set |
Location Description | Construction on state highway in Sacramento County in and near Sacramento from 1.1 miles south of Elk Grove Boulevard to American River Viaduct |
QA Service Level | 1 (Verified on 07/19/2019) |
Sample Information
Sample Taken Date | 06/14/2020 | Sample Unique Key | 4 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 06/17/2020 |
Sample type | Department Acceptance | A brief description of the sample | Asphalt Binder |
The quantity of what the sample constitutes | 1 Can, #1 Test | From where was the sample collected | Source |
First name of sampler or witnessed by | M | Last name of sampler or witnessed by | Chitlenden |
Title of sampler | Consultant | Telephone number of sampler | |
Laboratory sample identification | AB206052 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | Unknown | Transportation Laboratory (TL) Number | 716451 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Asphalt Binder | Performance Grade | PG 64-28 M |
---|---|---|---|
Modified | Yes | Lot number | Not set |
Sublot number | Not set | Tank number | Not set |
Time of sample | Not set | HMA Supplier | Not set |
Certified Asphalt Supplier | Not set | Multigrade | Not set |
Multigrade Type | Not set | Asphalt Binder Mix Number | Not set |
Test Details
DIME Sample ID: 2020-06-14-4
DIME Test ID: 2020-06-14-4-1
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2020-07-01
Test Results
Is mass change based on one or two containers?: One
Input Type: Measured
Tester's full name: Juan Gomez
Date of test: 06/18/2020
Any material loss from containers during heating process/testing?: No
Mass of empty container #1: 174.39 grams
Mass of container #1 before test (m1i): 209.32 grams
Mass of container #1 after test (m1f): 209.06 grams
Average mass change: -0.744 percent
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 7/1/2020 ✔
Warning: The test results shown on this page have been superseded and are invalid.
This information is for reference only.