Summary for Test 2020-05-12-8-10

Test performed: CTM 202-November 2011

Project Information

Project IdentifiersProject ID: 214523
DEA: 07302504
EFIS: 0713000479
DIST-CO-RTE-PM07-VEN-23-R3.3/R11.5
Award Date02/06/2020
Closeout DateNot set
Work DescriptionPLACE HMA AND JPCP AND INDIVIDUAL SLAB REPLACEMENT.
Location DescriptionVENTURA COUNTY FROM ROUTE 101/23 SEPARATION TO NEW LOS ANGELES AVENUE UNDERCROSSING
QA Service Level1 (Verified on 03/17/2020)

Sample Information

Sample Taken Date05/12/2020 Sample Unique Key8
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing05/14/2020
Sample typeVerification A brief description of the sample3/4 HMA-A-SP R15 Aggregate and RAP
The quantity of what the sample constitutesJMF 12 Bags From where was the sample collectedManufacturer
First name of sampler or witnessed byJay Last name of sampler or witnessed byOlsen
Title of sampler Telephone number of sampler
Laboratory sample identification0242A-20 Linked DIME Sample ID
The fabricator/manufacturer/facility nameVulcan Materials Sun Valley Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)91-19-0017, 91-19-0019, 91-19-0021
The fabricator's/manufacturer's product name for the sample3/4 HMA-A-SP R15 The fabricator/manufacturer designation for the sampleUnknown
The plant number220831 SVA MPC A detailed description of where the material sample was collectedBelt Cut at Vulcan Sun Valley Plant
Where the material sample would have been placed if not sampledAsphalt Paving Primary Aggregate Nominal Size3/4 inch
The concrete mix design numberUnknown Lot numberUnknown
Sublot numberUnknown Aggregate Mix NumberNot set

Test Details

DIME Sample ID: 2020-05-12-8
DIME Test ID: 2020-05-12-8-10
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: CTM 202-November 2011: Method of Test for Sieve Analysis of Fine and Coarse Aggregates
Test Release Date: 2020-06-02

Test Results


What size aggregate is being tested?: Combined Gradation
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
For Combined Gradation only, has the fine aggregate sample been reduced?: No
For Combined Gradation only, use #40 Sieve?: No
Input Type: Calculated
Tester's full name: Sebastian Ferrer, Satish Jain
Date of test: 06/02/2020
Cumulative percent passing the 3 in. sieve: 100 %
Cumulative percent passing the 2 1/2 in. sieve: 100 %
Cumulative percent passing the 2 in. sieve: 100 %
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 100 %
Cumulative percent passing the 1/2 in. sieve: 87 %
Cumulative percent passing the 3/8 in. sieve: 74 %
Cumulative percent passing the #4 sieve: 52 %
Cumulative percent passing the #8 sieve: 38 %
Cumulative percent passing the #16 sieve: 29 %
Cumulative percent passing the #30 sieve: 20 %
Cumulative percent passing the #50 sieve: 12 %
Cumulative percent passing the #100 sieve: 7 %
Cumulative percent passing the #200 sieve: 3.7 %
General comments (publicly viewable) (Max 1000 characters): Combined RAP/Virgin Aggregate Gradation w/correlation Factors Applied (please note that bin percentages from 3/25/20 were used for batching)

Test was verified on 6/2/2020