Summary for Test 2014-08-14-31-2
Test performed: CTM 217-June 2011Project Information
Project Identifiers | Project ID: 209020 DEA: 07288014 EFIS: 0700020957 |
---|---|
DIST-CO-RTE-PM | 07-LA-210-R9.7/R16.1 |
Award Date | 10/18/2013 |
Closeout Date | 05/10/2017 |
Work Description | REPLACE EXIST PVMT WITH PCC AND HMA AND REPLACE MEDIAN CONC BARRIER. |
Location Description | LOS ANGELES COUNTY IN LOS ANGELES AND GLENDALE FROM 0.2 MILE WEST OF BIG TUJUNGA WASH BRIDGE TO DUNSMORE AVENUE UNDERCROSSING |
QA Service Level | 1 (Verified on 10/10/2014) |
Sample Information
Sample Taken Date | 08/14/2014 | Sample Unique Key | 31 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 08/18/2014 |
Sample type | Department Acceptance | A brief description of the sample | Class 3 Aggregate Base |
The quantity of what the sample constitutes | 3 Bags | From where was the sample collected | Other |
First name of sampler or witnessed by | Ramzy | Last name of sampler or witnessed by | Nabulsi |
Title of sampler | Unknown | Telephone number of sampler | Unknown |
Laboratory sample identification | 4234B | Linked DIME Sample ID | 0 |
The fabricator/manufacturer/facility name | EB 210 Sta 610 00 East of Sunland Blvd On Ramp | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | Not set | |
Structure name | Not set |
Material Information
Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | Unknown |
---|---|---|---|
The fabricator's/manufacturer's product name for the sample | Unknown | The fabricator/manufacturer designation for the sample | Unknown |
The plant number | Unknown | A detailed description of where the material sample was collected | Sample was taken at approximately Sta 610 00 from a stockpile where crushing machine was processing |
Where the material sample would have been placed if not sampled | Unknown | Primary Aggregate Nominal Size | |
The concrete mix design number | Lot number | Not set | |
Sublot number | Not set | Aggregate Mix Number | Not set |
Test Details
DIME Sample ID: 2014-08-14-31
DIME Test ID: 2014-08-14-31-2
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: CTM 217-June 2011: Method of Test for Sand Equivalent
Test Release Date: 2015-02-20
Test Results
Number of tests: 1
Input Type: Calculated
Tester's full name: Nemencio Daof
Date of test: 10/21/2014
Temperature correction: no data
Temperature of solution: no data
Clay reading (test 1): no data
Sand reading (test 1): no data
Sand equivalent (test 1): no data
Sand equivalent before temperature correction: no data
Sand equivalent after temperature correction: 49
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 2/20/2015 ✔