Summary for Test 2020-03-11-11-1

Test performed: CTM 342-August 2012

Project Information

Project IdentifiersProject ID: 208973
DEA: 120H1004
EFIS: 1200000180
COOP: 120670
DIST-CO-RTE-PM12-ORA-405,73,405,605-9.3/24.3
Award Date11/07/2016
Closeout DateNot set
Work Description(Alternative Delivery) San Diego Freeway (I-405) Improvement Project SR-73 to I-605, Design Build Project, Administered by Orange County Transportation Authority, Caltrans METS to perform Source Inspection per RFP.
Location DescriptionOrange and Los Angeles Counties: 12-ORA-405 PM 9.3/24.2 / 07-LA-405 PM 0.0/1.2 12-ORA-22 PM R0.7/R3.8 / 12-ORA-22 PM R0.5/R0.7 12-ORA-73 PM R27.2/R27.8 / 12-ORA-605 PM 3.5/R1.6 07-LA-605 PM R0.0/R1.2
QA Service Level1 (Verified on 09/10/2015)

Sample Information

Sample Taken Date03/11/2020 Sample Unique Key11
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing03/03/2020
Sample typeQuality Assurance A brief description of the sampleBridge deck and Approach slap
The quantity of what the sample constitutes2 From where was the sample collectedJob Site
First name of sampler or witnessed byJose Last name of sampler or witnessed byMendez
Title of samplerTET Telephone number of sampler
Laboratory sample identification1200000180Rte405Magnolia St OC Linked DIME Sample ID2020-03-11-11
The fabricator/manufacturer/facility nameStructures Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier55-1121
Structure name

Material Information

Material TypeRoadway/Bridge Surface Pavement Surface TypeNot set
Type of Traffic Control ProvidedNot set DIST-CO-RTENot set
Direction of TravelNot set Post MileNot set
Lanes to be TestedNot set StationNot set

Test Details

DIME Sample ID: 2020-03-11-11
DIME Test ID: 2020-03-11-11-1
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Test Release Date: 2020-03-11

Test Results


Pavement or Bridge Deck?: Bridge Deck
Input Type: Calculated
Tester's full name: Jose Mendez
Date of test: 03/11/2020
Tire Pressure: 24 psi
Average Coefficient of Friction: 0.43
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 3/11/2020