Summary for Test 2020-01-30-38-5

Test performed: CTM 504-June 2010

Project Information

Project IdentifiersProject ID: 209141
DEA: 07215954
EFIS: 0700001835
DIST-CO-RTE-PM07-LA-5-0.0/7.6
Award Date04/24/2014
Closeout Date07/14/2022
Work DescriptionWIDENING FREEWAY AND RECONSTRUCT OVERHEAD AND OVERCROSSING STRUCTURES
Location DescriptionLOS ANGELES COUNTY IN LA MIRADA, SANTA FE SPRINGS, NORWALK AND DOWNEY FROM ORANGE COUNTY/LOS ANGELES COUNTY LIMIT LINES TO 0.7 MILE NORTH OF ROUTE 605
QA Service Level1 (Verified on 06/02/2014)

Sample Information

Sample Taken Date01/30/2020 Sample Unique Key38
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing01/31/2020
Sample typeQuality Control A brief description of the sample6x12 concrete cylinders
The quantity of what the sample constitutes6 From where was the sample collectedJob Site
First name of sampler or witnessed byDwayne Last name of sampler or witnessed byOvalle
Title of samplerQC Field Technician Telephone number of samplerUnknown
Laboratory sample identificationSet 3 Linked DIME Sample IDUnknown
The fabricator/manufacturer/facility nameJobsite Transportation Laboratory (TL) NumberUnknown
Inspector Lot Number from the Transportation Laboratory (TL) FormUnknown Structure unique identifier00-0000
Structure nameAbut 2 Approach Slab

Material Information

Material TypeConcrete The concrete mix design numberG3-15-STR-002
The truck number from where the sample was collectedLoad 14 The batch plant ticket number from where the sample was collected0
Concrete batch plantUnknown The fabricator/manufacturer designation for the sampleSet 3
A detailed description of where the material sample was collectedFloerence Bridge - Abutment 4 Where the material sample would have been placed if not sampledUnknown
From Lot No.Unknown Bag Lot No.Unknown

Test Details

DIME Sample ID: 2020-01-30-38
DIME Test ID: 2020-01-30-38-5
Testing Lab: G3 Quality, Incorporated - Cerritos
Test Method: CTM 504-June 2010: Method of Test for Determining Air Content of Freshly Mixed Concrete by the Pressure Method
Test Release Date: 2020-03-05

Test Results


Input Type: Calculated
Tester's full name: Dwayne Ovalle
Date of test: 01/30/2020
Air Content: 1 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 3/5/2020