Summary for Test 2019-10-04-9-9
Test performed: CTM 533-June 2010Project Information
Project Identifiers | Project ID: 211260 DEA: 072159U4 EFIS: 0715000160 |
---|---|
DIST-CO-RTE-PM | 07-LA,ORA-5-0.0/1.5, 44.3/44.4 |
Award Date | 05/27/2016 |
Closeout Date | 08/01/2023 |
Work Description | CONSTRUCT HOV LANES AND MIX FLOW LANES. |
Location Description | LOS ANGELES AND ORANGE COUNTIES IN BUENA PARK, LA MIRADA, CERRITOS AND SANTA FE SPRINGS FROM ARTESIA BOULEVARD UNDERCROSSING TO NORTH FORK COYOTE CREEK |
QA Service Level | 1 (Verified on 03/16/2016) |
Sample Information
Sample Taken Date | 10/04/2019 | Sample Unique Key | 9 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 10/04/2019 |
Sample type | Quality Control | A brief description of the sample | 6X12 Cylinders |
The quantity of what the sample constitutes | 10 | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Javier | Last name of sampler or witnessed by | Solorio |
Title of sampler | QC Field Technician | Telephone number of sampler | Unknown |
Laboratory sample identification | Set 1 | Linked DIME Sample ID | Unknown |
The fabricator/manufacturer/facility name | Volumetric | Transportation Laboratory (TL) Number | Unknown |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Unknown | Structure unique identifier | 00-0000 |
Structure name | Unknown |
Material Information
Material Type | Concrete | The concrete mix design number | CTS-1-14 |
---|---|---|---|
The truck number from where the sample was collected | Load 1 | The batch plant ticket number from where the sample was collected | 0 |
Concrete batch plant | Security Paving | The fabricator/manufacturer designation for the sample | Set 1 |
A detailed description of where the material sample was collected | North Side of Bridge, STA 53-3045 | Where the material sample would have been placed if not sampled | Unknown |
From Lot No. | Unknown | Bag Lot No. | Unknown |
Test Details
DIME Sample ID: 2019-10-04-9
DIME Test ID: 2019-10-04-9-9
Testing Lab: G3 Quality, Incorporated - Cerritos
Test Method: CTM 533-June 2010: Method of Test for Ball Penetration in Fresh Portland Cement Concrete
Test Release Date: 2019-12-02
Test Results
Input Type: Calculated
Tester's full name: Javier Solorio
Date of test: 10/04/2019
Ball penetration in freshly mixed concrete (average): 2.5 inch
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 12/2/2019 ✔