Summary for Test 2019-11-22-9-1
Test performed: SMTL BILST-06Project Information
Project Identifiers | Project ID: 3825 DEA: 07138204 EFIS: 0700000142 |
---|---|
DIST-CO-RTE-PM | 07-LA-47,103-3.5/4.6,0.0/1.1 |
Award Date | 06/30/2011 |
Closeout Date | 07/14/2022 |
Work Description | REPLACE STEEL BRIDGE WITH CIP PS CONCRETE BOX GIRDER BRIDGE AND RAMPS. |
Location Description | LOS ANGELES COUNTY IN LONG BEACH AND LOS ANGELES ON ROUTE 47 FROM OCEAN BOULEVARD TO ROUTE 103 JUNCTION AND ON ROUTE 103 FROM ROUTE 47 JUNCTION TO ANAHEIM STREET OVERHEAD |
QA Service Level | 1 (Verified on 03/29/2012) |
Sample Information
Sample Taken Date | 11/22/2019 | Sample Unique Key | 9 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 11/26/2019 |
Sample type | Quality Assurance | A brief description of the sample | Elastomeric Bearing pad |
The quantity of what the sample constitutes | 51 | From where was the sample collected | Manufacturer |
First name of sampler or witnessed by | David | Last name of sampler or witnessed by | Simon |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | DS Brown | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | SMTL TM1 - Elastomeric Bearing Pad | Mfg. Lot Number(s) | C1911-5558-11 |
---|---|---|---|
Material/Compound/Elastomer ID | na | Samples Representing | 51 |
Description (size) | 0.75" | Comments | Unknown |
Description (Number of Shims) | na | Type of Bearing Pad | Plain |
Description (Thickness of Shims) | NA | Manufacturer(s) | DS Brown |
Batch Number | na |
Test Details
DIME Sample ID: 2019-11-22-9
DIME Test ID: 2019-11-22-9-1
Testing Lab: CT HQ - Sacramento Chemistry Laboratory
Test Method: SMTL BILST-06: (Neoprene Verification) Bilstein Test
Test Release Date: 2019-11-27
Test Results
Input Type: Calculated
Tester's full name: Mariano Pontillas
Date of test: 11/27/2019
Result: Pass
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 11/27/2019 ✔