Summary for Test 2019-11-14-2-2

Test performed: ASTM A970-15e1

Project Information

Project IdentifiersProject ID: 211260
DEA: 072159U4
EFIS: 0715000160
DIST-CO-RTE-PM07-LA,ORA-5-0.0/1.5, 44.3/44.4
Award Date05/27/2016
Closeout Date08/01/2023
Work DescriptionCONSTRUCT HOV LANES AND MIX FLOW LANES.
Location DescriptionLOS ANGELES AND ORANGE COUNTIES IN BUENA PARK, LA MIRADA, CERRITOS AND SANTA FE SPRINGS FROM ARTESIA BOULEVARD UNDERCROSSING TO NORTH FORK COYOTE CREEK
QA Service Level1 (Verified on 03/16/2016)

Sample Information

Sample Taken Date11/14/2019 Sample Unique Key2
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing11/27/2019
Sample typeQuality Assurance A brief description of the sampleHeaded Bar
The quantity of what the sample constitutes592 bars total From where was the sample collectedManufacturer
First name of sampler or witnessed byDavid Last name of sampler or witnessed byWeeks
Title of samplerASI Telephone number of sampler310-883-8369
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameIntegrity Rebar Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) FormL79-186-19 Structure unique identifier53-3045
Structure nameValley View

Material Information

Material TypeSMTL TM5 - Headed Bars Production or Authorization TestingProduction Testing
Rebar Heat Number(s)4088283 Head Manufacturer Lot Number(s)1 and 3
Rebar Size6 Headed Bar Model NameBNX Buttonhead
Size of HeadFull Size - 9x Head Connection TypeCrimped Head
Head ShapeCircular Rebar ManufacturerCMC
Head ManufacturerBarSplice Head FabricatorIntegrity
Material Standard CodeASTM A706 Headed Bar Unique IDNot set

Test Details

DIME Sample ID: 2019-11-14-2
DIME Test ID: 2019-11-14-2-2
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: ASTM A970-15e1: Standard Specification for Headed Steel Bars for Concrete Reinforcement (Tensile)
Test Release Date: 2019-12-05

Test Results


Number of Headed Bar Samples: 1
Input Type: Measured
Tester's full name: bewing
Date of test: 11/27/2019
UTM: 400kip
Temperature: 72 f
NumLot #Area (sqin)Peak Load (lbf)Tensile Strength (psi)CommentsTested By
110.4444043100097Ok Neckingbewing

General comments (publicly viewable) (Max 1000 characters): Ok Necking
Test Graph
Source: Bluehill Data Point File
Test graph for the Sample

Test was verified on 12/5/2019