Summary for Test 2019-10-19-22-2
Test performed: CTM 524-March 2013Project Information
Project Identifiers | Project ID: 214157 DEA: 081H3404 EFIS: 0817000016 |
---|---|
DIST-CO-RTE-PM | 08-SBD-210,215-21.1/R26.3,4.1/14.3 |
Award Date | 06/19/2019 |
Closeout Date | 09/02/2020 |
Work Description | PRECAST SLAB AND CURB RAMP REPLACEMENT AND PLACE RHMA-G. |
Location Description | SAN BERNARDINO COUNTY ON ROUTE 210 FROM 0.6 MILE EAST OF STATE STREET TO STERLING AVENUE AND ON ROUTE 215 FROM PALM STREET TO ROUTE 10/215 SEPARATION |
QA Service Level | 1 (Verified on 11/04/2019) |
Sample Information
Sample Taken Date | 10/19/2019 | Sample Unique Key | 22 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 10/20/2019 |
Sample type | Acceptance | A brief description of the sample | Concrete beams |
The quantity of what the sample constitutes | 3 beams | From where was the sample collected | Job Site |
First name of sampler or witnessed by | RMA | Last name of sampler or witnessed by | QC |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | 1J-1A, 1J-1B, 1J-1C | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | RV Concrete Inc | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Concrete | The concrete mix design number | RVC-60-3 |
---|---|---|---|
The truck number from where the sample was collected | Unknown | The batch plant ticket number from where the sample was collected | TT1 |
Concrete batch plant | Unknown | The fabricator/manufacturer designation for the sample | Unknown |
A detailed description of where the material sample was collected | On Job Site at Concrete Truck | Where the material sample would have been placed if not sampled | Unknown |
From Lot No. | Unknown | Bag Lot No. | Unknown |
Test Details
DIME Sample ID: 2019-10-19-22
DIME Test ID: 2019-10-19-22-2
Testing Lab: CT D08 - Fontana Field Testing Laboratory
Test Method: CTM 524-March 2013: Method of Test for Flexural Strength Of Rapid Strength Concrete
Test Release Date: 2019-11-20
Test Results
Number of specimens: 1
Does the testing machine measure load or stress on the beam specimen?: Load
Fracture initiates in the tension surface: Within the Middle Third of the Span Length
Fracture occurred at a capped section: No
Is a beam dimensional correction factor used?: No
Input Type: Calculated
Tester's full name: A. Nguyen, A. Alzubi
Date of test: 10/29/2019
Identification number: 1J-1B
Width of specimen: 6.0625 inch
Depth of specimen: 6.0625 inch
Span length of specimen: 18 inch
Maximum load applied: 8300 lb
Curing history and apparent moisture condition of the specimen: Sand pit
If specimen was capped, ground or if leather shims were used: No
Defects in specimen, including numbers of beams discarded during test: No
Age of specimen: 10 days
Age of specimen in hours: no data
Modulus of rupture: 700 psi
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 11/20/2019 ✔