Summary for Test 2019-10-06-3-2
Test performed: CTM 524-March 2013Project Information
Project Identifiers | Project ID: 213746 DEA: 080Q75U4 EFIS: 0817000114 |
---|---|
DIST-CO-RTE-PM | 08-SBD,RIV-60-R4.6/R9.9, R0.0/12.2 |
Award Date | 04/18/2019 |
Closeout Date | 06/28/2022 |
Work Description | REPLACEMENT OF TWO OUTSIDE LANES AND CONCRETE SLABS |
Location Description | Not set |
QA Service Level | 1 (Verified on 06/17/2019) |
Sample Information
Sample Taken Date | 10/06/2019 | Sample Unique Key | 3 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 10/07/2019 |
Sample type | Department Acceptance | A brief description of the sample | Concrete beams |
The quantity of what the sample constitutes | 3 beams | From where was the sample collected | Job Site |
First name of sampler or witnessed by | RMA | Last name of sampler or witnessed by | QC |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | 9J-10A, 9J-10B, 9J-10C, | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | RV Concrete Inc | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Concrete | The concrete mix design number | RVC-60-1 |
---|---|---|---|
The truck number from where the sample was collected | Unknown | The batch plant ticket number from where the sample was collected | TT1 |
Concrete batch plant | Unknown | The fabricator/manufacturer designation for the sample | Unknown |
A detailed description of where the material sample was collected | On Job Site at Concrete Truck | Where the material sample would have been placed if not sampled | Unknown |
From Lot No. | Unknown | Bag Lot No. | Unknown |
Test Details
DIME Sample ID: 2019-10-06-3
DIME Test ID: 2019-10-06-3-2
Testing Lab: CT D08 - Fontana Field Testing Laboratory
Test Method: CTM 524-March 2013: Method of Test for Flexural Strength Of Rapid Strength Concrete
Test Release Date: 2019-10-30
Test Results
Number of specimens: 1
Does the testing machine measure load or stress on the beam specimen?: Load
Fracture initiates in the tension surface: Within the Middle Third of the Span Length
Fracture occurred at a capped section: No
Is a beam dimensional correction factor used?: No
Input Type: Calculated
Tester's full name: A. Alzubi, E. Jabbour
Date of test: 10/16/2019
Identification number: 9J-10B
Width of specimen: 6.125 inch
Depth of specimen: 6.125 inch
Span length of specimen: 18 inch
Maximum load applied: 9870 lb
Curing history and apparent moisture condition of the specimen: Sand Pit
If specimen was capped, ground or if leather shims were used: No
Defects in specimen, including numbers of beams discarded during test: No
Age of specimen: 10 days
Age of specimen in hours: no data
Modulus of rupture: 810 psi
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 10/30/2019 ✔