Summary for Test 2019-09-17-22-4
Test performed: CTM 217-June 2011Project Information
Project Identifiers | Project ID: 214032 DEA: 09378604 EFIS: 0918000080 |
---|---|
DIST-CO-RTE-PM | 09-KER-58-R128.9/R135.1 |
Award Date | 05/13/2019 |
Closeout Date | 12/02/2019 |
Work Description | COLD PLANE AC PAVEMENT AND PLACE HMA. |
Location Description | KERN COUNTY NEAR BORON FROM 1.3 MILES EAST OF CALIFORNIA CITY BOULEVARD TO 1.3 MILES WEST OF TWENTY MULE TEAM OVERCROSSING |
QA Service Level | NOT VERIFIED |
Sample Information
Sample Taken Date | 09/17/2019 | Sample Unique Key | 22 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 09/25/2019 |
Sample type | Department Acceptance | A brief description of the sample | Coldfeed Virgin 3/4" Aggregate |
The quantity of what the sample constitutes | 1 bag | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Tim | Last name of sampler or witnessed by | Reyes |
Title of sampler | QC Supervisor | Telephone number of sampler | |
Laboratory sample identification | 8736 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | Little Rock, Granite Construction | Transportation Laboratory (TL) Number | C912442 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | Unknown |
---|---|---|---|
The fabricator's/manufacturer's product name for the sample | Unknown | The fabricator/manufacturer designation for the sample | Unknown |
The plant number | Unknown | A detailed description of where the material sample was collected | Rte 58, Boron CA |
Where the material sample would have been placed if not sampled | Unknown | Primary Aggregate Nominal Size | 3/4 inch |
The concrete mix design number | Unknown | Lot number | 1 |
Sublot number | 7 | Aggregate Mix Number | Not set |
Test Details
DIME Sample ID: 2019-09-17-22
DIME Test ID: 2019-09-17-22-4
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: CTM 217-June 2011: Method of Test for Sand Equivalent
Test Release Date: 2019-10-09
Test Results
Number of tests: 2
Input Type: Calculated
Tester's full name: Kiet Phan
Date of test: 10/04/2019
Temperature correction: 0
Temperature of solution: 73
Clay reading (test 1): 4.4
Sand reading (test 1): 5.8
Clay reading (test 2): 4
Sand reading (test 2): 4.8
Sand equivalent (test 1): 76
Sand equivalent (test 2): 84
Sand equivalent before temperature correction: 80
Sand equivalent after temperature correction: 80
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 10/9/2019 ✔