Summary for Test 2019-06-27-32-10
Test performed: CTM 301-March 2000Project Information
Project Identifiers | Project ID: 214339 DEA: 081G0004 EFIS: 0815000107 |
---|---|
DIST-CO-RTE-PM | 08-RIV-95-14.5/35.6 |
Award Date | 11/04/2020 |
Closeout Date | 03/01/2022 |
Work Description | CONSTRUCT CONCRETE/RSP APRONS |
Location Description | RIVERSIDE COUNTY AT VARIOUS LOCATIONS FROM 4 MILES NORTH OF PALO VERDE DAM ROAD TO 0.6 MILE SOUTH OF SAN BERNARDINO COUNTY LINE |
QA Service Level | 1 (Verified on 12/02/2020) |
Sample Information
Sample Taken Date | 06/27/2019 | Sample Unique Key | 32 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 06/28/2019 |
Sample type | Per Request | A brief description of the sample | Soil |
The quantity of what the sample constitutes | 1 bag | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Jose | Last name of sampler or witnessed by | Guzman |
Title of sampler | MREA | Telephone number of sampler | 909-829-6292 |
Laboratory sample identification | 8634 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | Caltrans | Transportation Laboratory (TL) Number | 8634 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Soil | The fabricator's/manufacturer's product name for the sample | Unknown |
---|---|---|---|
The fabricator/manufacturer designation for the sample | Unknown | A detailed description of where the material sample was collected | A-19-009 |
Where the material sample would have been placed if not sampled | Unknown |
Test Details
DIME Sample ID: 2019-06-27-32
DIME Test ID: 2019-06-27-32-10
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: CTM 301-March 2000: Method for Determining the Resistance "R" Value of Treated and Untreated Bases, Subbases, and Basement Soils by the Stabilometer
Test Release Date: 2019-09-17
Test Results
How will the R value be determined?: By stabilometer
Input Type: Calculated
Tester's full name: Tess Perez/Kiet Phan
Date of test: 07/11/2019
As Received Gradation, Percent Passing 3 in. sieve: 100 %
As Received Gradation, Percent Passing 2 1/2 in. sieve: 100 %
As Received Gradation, Percent Passing 2 in. sieve: 100 %
As Received Gradation, Percent Passing 1 1/2 in. sieve: 96 %
As Received Gradation, Percent Passing 1 in. sieve: 89 %
As Received Gradation, Percent Passing 3/4 in. sieve: 86 %
As Received Gradation, Percent Passing 1/2 in. sieve: 79 %
As Received Gradation, Percent Passing 3/8 in. sieve: 75 %
As Received Gradation, Percent Passing #4 sieve: 66 %
As Received Gradation, Percent Passing #8 sieve: 58 %
As Received Gradation, Percent Passing #16 sieve: 51 %
As Received Gradation, Percent Passing #30 sieve: 45 %
As Received Gradation, Percent Passing #50 sieve: 32 %
As Received Gradation, Percent Passing #100 sieve: 18 %
As Received Gradation, Percent Passing #200 sieve: 12 %
As Used Gradation, Percent Passing 3 in. sieve: 100 %
As Used Gradation, Percent Passing 2 1/2 in. sieve: 100 %
As Used Gradation, Percent Passing 2 in. sieve: 100 %
As Used Gradation, Percent Passing 1 1/2 in. sieve: 96 %
As Used Gradation, Percent Passing 1 in. sieve: 89 %
As Used Gradation, Percent Passing 3/4 in. sieve: 86 %
As Used Gradation, Percent Passing 1/2 in. sieve: 79 %
As Used Gradation, Percent Passing 3/8 in. sieve: 75 %
As Used Gradation, Percent Passing #4 sieve: 66 %
As Used Gradation, Percent Passing #8 sieve: 58 %
As Used Gradation, Percent Passing #16 sieve: 51 %
As Used Gradation, Percent Passing #30 sieve: 45 %
As Used Gradation, Percent Passing #50 sieve: 32 %
As Used Gradation, Percent Passing #100 sieve: 18 %
As Used Gradation, Percent Passing #200 sieve: 12 %
R value: 71
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 9/17/2019 ✔