Summary for Test 2019-08-13-7-1
Test performed: AASHTO T308-10Project Information
Project Identifiers | Project ID: 214006 DEA: 09373704 EFIS: 0918000004 |
---|---|
DIST-CO-RTE-PM | 09-KER-178,395-75.0/81.0,R23.4/29.5 |
Award Date | 04/19/2019 |
Closeout Date | 01/06/2020 |
Work Description | PLACE HMA (TYPE A) AND RHMA-G. |
Location Description | KERN COUNTY ABOUT 11 MILES WEST OF INYOKERN ON ROUTE 178 FROM 2.0 MILES WEST TO 4.0 MILES EAST OF CANE BRAKE CREEK BRIDGE AND NEAR INYOKERN ON ROUTE 395 FROM 5.8 MILES NORTH TO 0.3 MILE SOUTH OF ROUTE 178/395 SEPARATION |
QA Service Level | NOT VERIFIED |
Sample Information
Sample Taken Date | 08/13/2019 | Sample Unique Key | 7 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 08/14/2019 |
Sample type | Acceptance | A brief description of the sample | 1/2 HMA-A-SP R25 |
The quantity of what the sample constitutes | 2 boxes | From where was the sample collected | Manufacturer |
First name of sampler or witnessed by | Blue Diamond Materials Victorville | Last name of sampler or witnessed by | QC |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | 0485A-19 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | Blue Diamond Victorville | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Hot Mix Asphalt | HMA Type | Type A HMA |
---|---|---|---|
HMA Grading | 1/2 inch | Lot number | Unknown |
Sublot number | Unknown | HMA Mix Number | Not set |
Test Details
DIME Sample ID: 2019-08-13-7
DIME Test ID: 2019-08-13-7-1
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2019-08-16
Test Results
What temperature unit is used?: Fahrenheit
Input Type: Calculated
Tester's full name: Angelito Villegas
Date of test: 08/15/2019
Test procedure used?: Method A
Mass of HMA Sample prior to ignition: no data
Mass Loss: no data
Correction Factor (Percent by mass of HMA Specimen): no data
Moisture Content: no data
Temperature Compensation Factor: no data
Test Temperature: no data
Corrected Asphalt Binder Content: 5.06 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 8/16/2019 ✔