Summary for Test 2019-07-27-1-1
Test performed: CTM 521-June 2012Project Information
Project Identifiers | Project ID: 213746 DEA: 080Q75U4 EFIS: 0817000114 |
---|---|
DIST-CO-RTE-PM | 08-SBD,RIV-60-R4.6/R9.9, R0.0/12.2 |
Award Date | 04/18/2019 |
Closeout Date | 06/28/2022 |
Work Description | REPLACEMENT OF TWO OUTSIDE LANES AND CONCRETE SLABS |
Location Description | Not set |
QA Service Level | 1 (Verified on 06/17/2019) |
Sample Information
Sample Taken Date | 07/27/2019 | Sample Unique Key | 1 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 07/30/2019 |
Sample type | Quality Assurance | A brief description of the sample | LCB RS Cylinders |
The quantity of what the sample constitutes | 2 | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Ivan | Last name of sampler or witnessed by | Lopez |
Title of sampler | RMA QC | Telephone number of sampler | |
Laboratory sample identification | 999-727 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | JMECI RV Concrete Inc | Transportation Laboratory (TL) Number | 20190727 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Concrete | The concrete mix design number | CTS-30-RAM |
---|---|---|---|
The truck number from where the sample was collected | 7 | The batch plant ticket number from where the sample was collected | NP |
Concrete batch plant | Unknown | The fabricator/manufacturer designation for the sample | Batch |
A detailed description of where the material sample was collected | EB 60 lane 2 Valley Way | Where the material sample would have been placed if not sampled | EB 60 lane 2 Valley Way |
From Lot No. | Unknown | Bag Lot No. | Unknown |
Test Details
DIME Sample ID: 2019-07-27-1
DIME Test ID: 2019-07-27-1-1
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: CTM 521-June 2012: Method of Test for Compressive Strength of Molded Concrete Cylinders
Test Release Date: 2019-08-05
Test Results
Number of specimens: 6
Input Type: Calculated
Tester's full name: Matthew Clayton
Date of test: 08/03/2019
Correction factor: 1
Cylinder Age: 7 days
Break Description of Cylinder 1 (if not 'cone'): 1
Break Description of Cylinder 2 (if not 'cone'): 1
Break Description of Cylinder 3 (if not 'cone'): 1
Break Description of Cylinder 4 (if not 'cone'): 4
Break Description of Cylinder 5 (if not 'cone'): 4
Break Description of Cylinder 6 (if not 'cone'): 1
Average Compressive Strength (to nearest 10): 1140 lb/in^2
Compressive Strength of Cylinder 1: 1110 lb/in^2
Compressive Strength of Cylinder 2: 1160 lb/in^2
Compressive Strength of Cylinder 3: 1150 lb/in^2
Compressive Strength of Cylinder 4: 1180 lb/in^2
Compressive Strength of Cylinder 5: 1100 lb/in^2
Compressive Strength of Cylinder 6: 1150 lb/in^2
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 8/5/2019 ✔