Summary for Test 2019-04-26-15-1
Test performed: ASTM C39-10Project Information
Project Identifiers | Project ID: 209694 DEA: 080J0704 EFIS: 0800000282 |
---|---|
DIST-CO-RTE-PM | 08-SBD-215-0.6/1.7 |
Award Date | 10/17/2017 |
Closeout Date | 04/23/2020 |
Work Description | (Alternative Delivery) The CMGC project will reconstruct and improve interchange of I-215 and Barton Road in the City of Grand Terrace, CA. |
Location Description | Grade separation at Intersection of I-215 and Barton Road near Grand Terrace, CA. ? On I-215 between I-10 and SR-60. |
QA Service Level | 1 (Verified on 12/11/2017) |
Sample Information
Sample Taken Date | 04/26/2019 | Sample Unique Key | 15 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 05/02/2019 |
Sample type | Quality Assurance | A brief description of the sample | 6x12 concrete cylinders |
The quantity of what the sample constitutes | 2 | From where was the sample collected | Job Site |
First name of sampler or witnessed by | EDDY | Last name of sampler or witnessed by | SCOTT |
Title of sampler | ASR | Telephone number of sampler | |
Laboratory sample identification | 975-426B | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | Robertson Riverside | Transportation Laboratory (TL) Number | 20190426B |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | abutment 4 foundation stage 2 | |
Structure name | abutment 4 foundation stage 2 |
Material Information
Material Type | Concrete | The concrete mix design number | SC590B38 |
---|---|---|---|
The truck number from where the sample was collected | 1155 | The batch plant ticket number from where the sample was collected | 4424302 |
Concrete batch plant | Unknown | The fabricator/manufacturer designation for the sample | MYERS RADOS JV |
A detailed description of where the material sample was collected | 185 cy | Where the material sample would have been placed if not sampled | abutment 4 foundation stage 2 |
From Lot No. | Unknown | Bag Lot No. | Unknown |
Test Details
DIME Sample ID: 2019-04-26-15
DIME Test ID: 2019-04-26-15-1
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: ASTM C39-10: Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens
Test Release Date: 2019-05-31
Test Results
Unit system used?: US Units
Number of specimens: 2
Test performed: With no density determined
Input Type: Measured
Tester's full name: MM
Date of test: 05/24/2019
Capped in accordance with?: ASTM C617/CTM521
Average diameter of cylinder 1: 6.02 in
Average diameter of cylinder 2: 6.02 in
Maximum load on cylinder 1: 122910 lb
Maximum load on cylinder 2: 123640 lb
Type of fracture pattern of cylinder 1: 1
Type of fracture pattern of cylinder 2: 1
Comment on any defect in either specimen or caps (Max 250 Characters): no data
Correction factor for cylinder 1: 1
Correction factor for cylinder 2: 1
Age of specimen: 28 days
Cross sectional area of cylinder 1: 28.46 in^2
Cross sectional area of cylinder 2: 28.46 in^2
Compressive strength of cylinder 1: 4318.7 psi
Compressive strength of cylinder 2: 4344.3 psi
Compressive strength (to nearest 10 psi): 4330 psi
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 5/24/2019 ✔