Summary for Test 2018-11-28-7-1

Test performed: AGGLP SIEVE_ANALYSIS-1

Project Information

Project IdentifiersProject ID: 88888
DEA: SMTL-STOCK
EFIS: SMTL-STOCK
DIST-CO-RTE-PM59---
Award DateNot set
Closeout DateNot set
Work DescriptionSpecial project for SMTL stock material. Object Code: 1025. J2 DEA: 912680.
Location DescriptionNot set
QA Service LevelNOT VERIFIED

Sample Information

Sample Taken Date11/28/2018 Sample Unique Key7
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing12/04/2018
Sample typePer Request A brief description of the sample1/2 in coarse agg
The quantity of what the sample constitutes3 bags of 1/2 size coarse agg From where was the sample collectedManufacturer
First name of sampler or witnessed byE Last name of sampler or witnessed byYip
Title of samplerMets Rep Telephone number of samplerUnknown
Laboratory sample identification18-0135 Linked DIME Sample IDUnknown
The fabricator/manufacturer/facility nameCoalinga Transportation Laboratory (TL) NumberC724452
Inspector Lot Number from the Transportation Laboratory (TL) FormUnknown Structure unique identifierNot set
Structure nameNot set

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)91-10-0006
The fabricator's/manufacturer's product name for the sampleUnknown The fabricator/manufacturer designation for the sampleUnknown
The plant numberUnknown A detailed description of where the material sample was collectedSierra Pacific Materials Avenal
Where the material sample would have been placed if not sampledUnknown Primary Aggregate Nominal Size1/2 inch
The concrete mix design numberUnknown Lot numberNot set
Sublot numberNot set Aggregate Mix NumberNot set
HMA PayNo

Test Details

DIME Sample ID: 2018-11-28-7
DIME Test ID: 2018-11-28-7-1
Testing Lab: CT HQ - Sacramento Aggregate Testing Laboratory
Test Method: AGGLP SIEVE_ANALYSIS-1: Soils for Corrosion Sieve Analysis
Test Release Date: 2018-12-20

Test Results


Input Type: Calculated
Tester's full name: Bang Nguyen
Date of test: 12/20/2018
Cumulative percent passing the 2 in. sieve: no data
Cumulative percent passing the 1 1/2 in. sieve: no data
Cumulative percent passing the 1 in. sieve: no data
Cumulative percent passing the 3/4 in. sieve: no data
Cumulative percent passing the 1/2 in. sieve: 51 %
Cumulative percent passing the 3/8 in. sieve: 1 %
Cumulative percent passing the #4 sieve: no data
Cumulative percent passing the #8 sieve: no data
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 12/20/2018