Summary for Test 2018-05-22-23-2
Test performed: AASHTO T30-15Project Information
Project Identifiers | Project ID: 212997 DEA: 023H2104 EFIS: 0217000070 |
---|---|
DIST-CO-RTE-PM | 02-PLU-70,89-53.5/58.4,21.0/29.9 |
Award Date | 03/02/2018 |
Closeout Date | 01/09/2019 |
Work Description | AC OVERLAY, REPLACE AC SURFACE, GUARDRAIL, SHOULDER BACKING |
Location Description | PLUMAS COUNTY ON ROUTE 70 FROM GREENHORN RANCH ROAD TO 0.2 MILE EAST OF SLOAT ROAD AND ON ROUTE 89 FROM 0.3 MILE SOUTH OF ALTA CAMP ROAD TO CANYON DAM PICNIC AREA |
QA Service Level | 1 (Verified on 02/02/2018) |
Sample Information
Sample Taken Date | 05/22/2018 | Sample Unique Key | 23 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 05/23/2018 |
Sample type | Verification | A brief description of the sample | Combined RAP |
The quantity of what the sample constitutes | JMF Verification | From where was the sample collected | Manufacturer |
First name of sampler or witnessed by | Lynn | Last name of sampler or witnessed by | Hunnicutt |
Title of sampler | Unknown | Telephone number of sampler | Unknown |
Laboratory sample identification | D77416 | Linked DIME Sample ID | Unknown |
The fabricator/manufacturer/facility name | Lockwood Hot Plant | Transportation Laboratory (TL) Number | 894815 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | JMF 18-12-S1 | Structure unique identifier | Not set |
Structure name | Not set |
Material Information
Material Type | Reclaimed Asphalt Pavement | RAP Source | Lockwood Hot Plant |
---|---|---|---|
Aggregate Size | 3/8-inch | Aggregate Source | Unknown |
RAP Stockpile | Continuous | Stockpile Size (tons) | 20000 |
Reclaimed Asphalt Pavement Mix Number | Not set | HMA Pay | No |
Test Details
DIME Sample ID: 2018-05-22-23
DIME Test ID: 2018-05-22-23-2
Testing Lab: CT D02 - Redding Northern Regional Laboratory
Test Method: AASHTO T30-15: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Test Release Date: 2018-12-17
Test Results
Input Type: Calculated
Tester's full name: NRML-R
Date of test: 05/28/2018
Cumulative percent passing the 2 in. sieve: no data
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 100 %
Cumulative percent passing the 1/2 in. sieve: 100 %
Cumulative percent passing the 3/8 in. sieve: 94.4 %
Cumulative percent passing the 1/4 in. sieve: 78.9 %
Cumulative percent passing the #4 sieve: 69 %
Cumulative percent passing the #8 sieve: 49.9 %
Cumulative percent passing the #16 sieve: 37.2 %
Cumulative percent passing the #30 sieve: 27.9 %
Cumulative percent passing the #50 sieve: 20 %
Cumulative percent passing the #100 sieve: 14.3 %
Cumulative percent passing the #200 sieve: 10.5 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 12/17/2018 ✔