Summary for Test 2018-04-20-8-3

Test performed: CTM 557-July 2012

Project Information

Project IdentifiersProject ID: 211260
DEA: 072159U4
EFIS: 0715000160
DIST-CO-RTE-PM07-LA,ORA-5-0.0/1.5, 44.3/44.4
Award Date05/27/2016
Closeout Date08/01/2023
Work DescriptionCONSTRUCT HOV LANES AND MIX FLOW LANES.
Location DescriptionLOS ANGELES AND ORANGE COUNTIES IN BUENA PARK, LA MIRADA, CERRITOS AND SANTA FE SPRINGS FROM ARTESIA BOULEVARD UNDERCROSSING TO NORTH FORK COYOTE CREEK
QA Service Level1 (Verified on 03/16/2016)

Sample Information

Sample Taken Date04/20/2018 Sample Unique Key8
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing04/21/2018
Sample typeQuality Control A brief description of the sample6x12 Cylinders
The quantity of what the sample constitutes6 From where was the sample collectedJob Site
First name of sampler or witnessed byDavid Last name of sampler or witnessed byAlvarado
Title of samplerQC Field Technician Telephone number of samplerUnknown
Laboratory sample identificationSet 1 Linked DIME Sample IDUnknown
The fabricator/manufacturer/facility nameJobsite Transportation Laboratory (TL) NumberUnknown
Inspector Lot Number from the Transportation Laboratory (TL) FormUnknown Structure unique identifierUnknown
Structure nameUnknown

Material Information

Material TypeConcrete The concrete mix design numberS62578
The truck number from where the sample was collectedLoad 1 The batch plant ticket number from where the sample was collected0
Concrete batch plantUnknown The fabricator/manufacturer designation for the sampleSet 1
A detailed description of where the material sample was collectedSlab Bridge Barrier Where the material sample would have been placed if not sampledUnknown
From Lot No.Unknown Bag Lot No.Unknown

Test Details

DIME Sample ID: 2018-04-20-8
DIME Test ID: 2018-04-20-8-3
Testing Lab: G3 Quality, Incorporated - Cerritos
Test Method: CTM 557-July 2012: Method of Test for Temperature of Freshly Mixed Portland Cement Concrete
Test Release Date: 2018-11-07

Test Results


Input Type: Calculated
Tester's full name: David Alvarado
Date of test: 04/20/2018
Temperature of the freshly mixed concrete: 73 F
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 11/7/2018