Summary for Test 2018-08-16-10-1
Test performed: AASHTO T308-10Project Information
Project Identifiers | Project ID: 213297 DEA: 010H3704 EFIS: 0117000165 |
---|---|
DIST-CO-RTE-PM | 01-LAK-20-33.6/37.1,45.2/46.5 |
Award Date | 06/07/2018 |
Closeout Date | 12/04/2018 |
Work Description | RUBBERIZED HOT MIX ASPHALT - GAP GRADED AND MIDWEST GUARDRAIL SYSTEM |
Location Description | LAKE COUNTY NEAR CLEARLAKE OAKS FROM 0.6 MILE EAST OF NEW LONG VALLEY ROAD TO NORTH FORK CACHE CREEK BRIDGE AND FROM 1.4 MILES EAST OF ABBOT MINE ROAD TO COLUSA COUNTY LINE |
QA Service Level | 1 (Verified on 04/27/2018) |
Sample Information
Sample Taken Date | 08/16/2018 | Sample Unique Key | 10 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 08/18/2018 |
Sample type | Verification | A brief description of the sample | 1/2 in RHMA-G |
The quantity of what the sample constitutes | JMF Verification | From where was the sample collected | Manufacturer |
First name of sampler or witnessed by | jack | Last name of sampler or witnessed by | martin |
Title of sampler | Unknown | Telephone number of sampler | Unknown |
Laboratory sample identification | 62110 | Linked DIME Sample ID | Unknown |
The fabricator/manufacturer/facility name | Granite HWY 175 | Transportation Laboratory (TL) Number | Unknown |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Unknown | Structure unique identifier | Not set |
Structure name | Not set |
Material Information
Material Type | Hot Mix Asphalt | HMA Type | RHMA-G |
---|---|---|---|
HMA Grading | 1/2 inch | Lot number | Not set |
Sublot number | Not set | HMA Mix Number | Not set |
HMA Pay | No |
Test Details
DIME Sample ID: 2018-08-16-10
DIME Test ID: 2018-08-16-10-1
Testing Lab: CT D01 - District 1 Materials Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2018-08-29
Test Results
What temperature unit is used?: Fahrenheit
Input Type: Calculated
Tester's full name: Leif Ayres
Date of test: 08/29/2018
Test procedure used?: Method A
Mass of HMA Sample prior to ignition: no data
Mass Loss: no data
Correction Factor (Percent by mass of HMA Specimen): no data
Moisture Content: no data
Temperature Compensation Factor: no data
Test Temperature: no data
Corrected Asphalt Binder Content: 7.47 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 8/29/2018 ✔