Summary for Test 2018-03-21-14-2

Test performed: CTM 202-Oct 2014

Project Information

Project IdentifiersProject ID: 208945
DEA: 07288604
EFIS: 0700021080
COOP: 074663
DIST-CO-RTE-PM07-LA-710-6.0-9.4
Award Date09/02/2011
Closeout DateNot set
Work DescriptionGerald Desmond Bridge Replacement - A Design Build project. IQA samples will be selected by Port/Caltrans representatives and sent to Translab for testing.
Location DescriptionPort of Long Beach (District 7)
QA Service Level1 (Verified on 06/03/2013)

Sample Information

Sample Taken Date03/21/2018 Sample Unique Key14
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing03/29/2018
Sample typeAcceptance A brief description of the sampleLightweight fine agg
The quantity of what the sample constitutes1 bag From where was the sample collectedManufacturer
First name of sampler or witnessed byJohn Last name of sampler or witnessed byDong
Title of samplerUnknown Telephone number of samplerUnknown
Laboratory sample identification18-0047 Linked DIME Sample IDUnknown
The fabricator/manufacturer/facility nameAssociated Signal Hill Transportation Laboratory (TL) NumberC914206B
Inspector Lot Number from the Transportation Laboratory (TL) FormUnknown Structure unique identifierNot set
Structure nameNot set

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)NA
The fabricator's/manufacturer's product name for the sampleUnknown The fabricator/manufacturer designation for the sampleUnknown
The plant numberUnknown A detailed description of where the material sample was collectedStockpile
Where the material sample would have been placed if not sampledUnknown Primary Aggregate Nominal Sizefine
The concrete mix design numberUnknown Lot numberNot set
Sublot numberNot set Aggregate Mix NumberNot set
HMA PayNo

Test Details

DIME Sample ID: 2018-03-21-14
DIME Test ID: 2018-03-21-14-2
Testing Lab: CT HQ - Sacramento Concrete Testing Laboratory
Test Method: CTM 202-Oct 2014: Method of Test for Determining Sieve Analysis of Fine and Coarse Aggregates
Test Release Date: 2018-07-02

Test Results


What size aggregate is being tested?: Fine Aggregate
Input Type: Calculated
Tester's full name: Bang Nguyen
Date of test: 06/22/2018
Cumulative percent passing the 3/8 in. sieve: 100 %
Cumulative percent passing the #4 sieve: 100 %
Cumulative percent passing the #8 sieve: 96 %
Cumulative percent passing the #16 sieve: 68 %
Cumulative percent passing the #30 sieve: 39 %
Cumulative percent passing the #50 sieve: 20 %
Cumulative percent passing the #100 sieve: 10 %
Cumulative percent passing the #200 sieve: 5 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 7/2/2018