Summary for Test 2017-11-01-13-3
Test performed: AASHTO T164-14Project Information
Project Identifiers | Project ID: 99999 DEA: 0322222 |
---|---|
DIST-CO-RTE-PM | 03-SAC,OMG-888,99,80-0.6-0.6 |
Award Date | Not set |
Closeout Date | Not set |
Work Description | THIS PROJECT RECORD WAS ADDED FOR DIME TESTERS - DATA SUBMITTED FOR THIS PROJECT SHOULD NOT BE USED FOR ANY OTHER PURPOSES. |
Location Description | THIS PROJECT RECORD WAS ADDED FOR DIME TESTERS - DATA SUBMITTED FOR THIS PROJECT SHOULD NOT BE USED FOR ANY OTHER PURPOSES. |
QA Service Level | (Verified on 04/05/2013) |
Sample Information
Sample Taken Date | 11/01/2017 | Sample Unique Key | 13 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | No | Date that the sample was received by the laboratory/organization performing the testing | Not set |
Sample type | Quality Control | A brief description of the sample | RAP |
The quantity of what the sample constitutes | 1 | From where was the sample collected | Source |
First name of sampler or witnessed by | Dime | Last name of sampler or witnessed by | Test |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Test | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | Not set | |
Structure name | Not set |
Material Information
Material Type | Reclaimed Asphalt Pavement | RAP Source | Mustang Pit |
---|---|---|---|
Aggregate Size | Aggregate Source | ||
RAP Stockpile | Stockpile Size (tons) | ||
Reclaimed Asphalt Pavement Mix Number | Not set | HMA Pay | No |
Test Details
DIME Sample ID: 2017-11-01-13
DIME Test ID: 2017-11-01-13-3
Testing Lab: CT HQ - Sacramento Materials Management Branch Field Office
Test Method: AASHTO T164-14: Standard Method of Test for Quantitative Extraction of Asphalt Binder from Hot Mix Asphalt (HMA) (Asphalt Binder Content)
Test Release Date: 2018-02-01
Test Results
Input Type: Calculated
Tester's full name: David Phong
Date of test: 02/01/2018
Corrected Asphalt Binder Content: 5.89 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 2/1/2018 ✔