Summary for Test 2018-01-26-3-1
Test performed: CTM 670-December 2013Project Information
Project Identifiers | Project ID: 211778 DEA: 04235654 EFIS: 0400000680 |
---|---|
DIST-CO-RTE-PM | 04-SM-101,114-1.3/2.5,5.0/5.3 |
Award Date | 02/10/2017 |
Closeout Date | 01/08/2020 |
Work Description | RECONSTRUCT INTERCHANGE |
Location Description | SAN MATEO COUNTY AT VARIOUS LOCATIONS ON ROUTE 101 FROM 0.4 MILE NORTH OF UNIVERSITY AVENUE OVERCROSSING TO 0.6 MILE SOUTH OF HENDERSON UNDERPASS AND ON ROUTE 114 FROM WILLOW ROAD SEPARATION TO NEWBRIDGE STREET |
QA Service Level | 1 (Verified on 10/24/2016) |
Sample Information
Sample Taken Date | 01/26/2018 | Sample Unique Key | 3 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 01/26/2018 |
Sample type | Quality Assurance | A brief description of the sample | Couplers |
The quantity of what the sample constitutes | 4 | From where was the sample collected | Manufacturer |
First name of sampler or witnessed by | Rick | Last name of sampler or witnessed by | Bettencourt |
Title of sampler | Unknown | Telephone number of sampler | Unknown |
Laboratory sample identification | Unknown | Linked DIME Sample ID | Unknown |
The fabricator/manufacturer/facility name | HRC CMC - Tracy | Transportation Laboratory (TL) Number | C874429 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | S25-003-18 | Structure unique identifier | Not set |
Structure name | Not set |
Material Information
Material Type | SMTL TM5 - Couplers | Production or Authorization Testing | Production Testing |
---|---|---|---|
Service or Ultimate | Ultimate | Material Standard Code | ASTM A706 |
Material Grade | 60 | Rebar Manufacturer | Gerdau |
Coupler Manufacturer | HRC | Intermediate Assembler or Fabricator | Unknown |
Rebar Size | 14 | Coupler Model | HRC50/510 |
Coating Standards | Uncoated | Shape of Rebar | Straight |
Rebar Hoop Diameter | Unknown | Rebar Hoop Fabricator | Unknown |
Coupler Component Heat/Lot Number(s) | 74104609, 74104411 | Rebar Heat Number(s) | 6501836103 |
Rebar Size 2 | Not set | Coupler Unique ID | Not set |
Test Details
DIME Sample ID: 2018-01-26-3
DIME Test ID: 2018-01-26-3-1
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Test Release Date: 2018-02-05
Test Results
Number of Samples: 1
Input Type: Measured
Tester's full name: Brian
Date of test: 01/29/2018
UTM: 2000KIP
Halo ID: Small
Temperature: 72 F
Num | Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Slip (inch) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By |
---|---|---|---|---|---|---|---|---|---|
1 | 1 | 1 | #14/43mm | 2.25 | -0.0032 | 220660 | 98071 | necking okay | Brian |
General comments (publicly viewable) (Max 1000 characters): necking okay
Test Graph
Source: Partner Data Point FileTest graph for the Sample
Test was verified on 1/29/2018 ✔