Summary for Test 2018-01-05-1-4
Test performed: CTM 670-December 2013Project Information
Project Identifiers | Project ID: 211848 DEA: 112T2174 EFIS: 1116000131 |
---|---|
DIST-CO-RTE-PM | 11-SD-5-R37.4 - R46.5 |
Award Date | 12/22/2016 |
Closeout Date | Not set |
Work Description | (Alternative Delivery) CMGC, San Elijo Highway Bridge Replacement. Replace the San Elijo lagoon highway bridge, construct HOV lanes, construct bike and pedestrian trails and bridge, build multi-use facility at Manchester Ave. |
Location Description | IN SAN DIEGO COUNTY IN SOLANA BEACH AND ENCINITAS FROM 0.1 MILE NORTH OF LOMAS SANTA FE DRIVE OVERCROSSING TO 0.2 MILE SOUTH OF BIRMINGHAM DRIVE OVERCROSSING |
QA Service Level | 1 (Verified on 01/31/2017) |
Sample Information
Sample Taken Date | 01/05/2018 | Sample Unique Key | 1 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 01/12/2018 |
Sample type | Quality Assurance | A brief description of the sample | HRC 410-490 Couplers |
The quantity of what the sample constitutes | 4 | From where was the sample collected | Fabricator |
First name of sampler or witnessed by | Edward | Last name of sampler or witnessed by | Trasoras |
Title of sampler | QA ASMR | Telephone number of sampler | 3235946208 |
Laboratory sample identification | Unknown | Linked DIME Sample ID | unknown |
The fabricator/manufacturer/facility name | HRC | Transportation Laboratory (TL) Number | C975253 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | L107-001-18 | Structure unique identifier | Not set |
Structure name | Not set |
Material Information
Material Type | SMTL TM5 - Couplers | Production or Authorization Testing | Production Testing |
---|---|---|---|
Service or Ultimate | Ultimate | Material Standard Code | ASTM A706 |
Material Grade | 60 | Rebar Manufacturer | Gerdau |
Coupler Manufacturer | HRC | Intermediate Assembler or Fabricator | To be performed at jobsite |
Rebar Size | 18 | Coupler Model | HRC 410/490 |
Coating Standards | Uncoated | Shape of Rebar | Straight |
Rebar Hoop Diameter | NA | Rebar Hoop Fabricator | NA |
Coupler Component Heat/Lot Number(s) | N16101394, NF100886179 | Rebar Heat Number(s) | 65028611, 65028077 |
Rebar Size 2 | Not set | Coupler Unique ID | Not set |
Test Details
DIME Sample ID: 2018-01-05-1
DIME Test ID: 2018-01-05-1-4
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Test Release Date: 2018-01-23
Test Results
Number of Samples: 1
Input Type: Measured
Tester's full name: Fred
Date of test: 01/16/2018
UTM: 2000KIP
Halo ID: Big
Temperature: 72 F
Num | Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Slip (inch) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By |
---|---|---|---|---|---|---|---|---|---|
1 | 4 | 2 | #18/57mm | 4 | 0 | 381755 | 95439 | necking okay | Fred |
General comments (publicly viewable) (Max 1000 characters): necking okay
Test Graph
Source: Partner Data Point FileTest graph for the Sample
Test was verified on 1/16/2018 ✔