Summary for Test 2017-04-07-25-1
Test performed: AASHTO T308-10Project Information
Project Identifiers | Project ID: 99999 DEA: 0322222 |
---|---|
DIST-CO-RTE-PM | 03-SAC,OMG-888,99,80-0.6-0.6 |
Award Date | Not set |
Closeout Date | Not set |
Work Description | THIS PROJECT RECORD WAS ADDED FOR DIME TESTERS - DATA SUBMITTED FOR THIS PROJECT SHOULD NOT BE USED FOR ANY OTHER PURPOSES. |
Location Description | THIS PROJECT RECORD WAS ADDED FOR DIME TESTERS - DATA SUBMITTED FOR THIS PROJECT SHOULD NOT BE USED FOR ANY OTHER PURPOSES. |
QA Service Level | (Verified on 04/05/2013) |
Sample Information
Sample Taken Date | 04/07/2017 | Sample Unique Key | 25 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 04/07/2017 |
Sample type | Quality Control | A brief description of the sample | RAP - Ign 2 |
The quantity of what the sample constitutes | JMF | From where was the sample collected | Manufacturer |
First name of sampler or witnessed by | a | Last name of sampler or witnessed by | a |
Title of sampler | Unknown | Telephone number of sampler | Unknown |
Laboratory sample identification | JMF 17-01-S1 | Linked DIME Sample ID | Unknown |
The fabricator/manufacturer/facility name | Hat Creek - Shaw Pit Facility | Transportation Laboratory (TL) Number | Unknown |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Unknown | Structure unique identifier | Not set |
Structure name | Not set |
Material Information
Material Type | Reclaimed Asphalt Pavement | RAP Source | Shaw Pit |
---|---|---|---|
Aggregate Size | 3/8-inch | Aggregate Source | Unknown |
RAP Stockpile | Stockpile Size (tons) | Unknown | |
Reclaimed Asphalt Pavement Mix Number | Not set |
Test Details
DIME Sample ID: 2017-04-07-25
DIME Test ID: 2017-04-07-25-1
Testing Lab: CT D02 - Redding Northern Regional Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2017-12-20
Test Results
What temperature unit is used?: Fahrenheit
Input Type: Calculated
Tester's full name: Ward Jenkins
Date of test: 04/07/2017
Test procedure used?: Method A
Mass of HMA Sample prior to ignition: no data
Mass Loss: no data
Correction Factor (Percent by mass of HMA Specimen): no data
Moisture Content: no data
Temperature Compensation Factor: no data
Test Temperature: no data
Corrected Asphalt Binder Content: 6.65 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 12/13/2017 ✔