Summary for Test 2017-07-27-9-1

Test performed: CONCLP 4-16

Project Information

Project IdentifiersProject ID: 212572
DEA: 030G9404
EFIS: 0317000204
DIST-CO-RTE-PM03-SAC,YOL/SAC-5,50-2.4/L0.7
Award Date06/21/2017
Closeout Date04/16/2021
Work DescriptionRemove MLS and 1" polyester concrete overlay on Pioneer Bridge in Sacramento, CA.
Location DescriptionSacramento, CA
QA Service Level1 (Verified on 07/12/2017)

Sample Information

Sample Taken Date07/27/2017 Sample Unique Key9
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing07/27/2017
Sample typeQuality Control A brief description of the sample2 pints 204,chp,zcure,8020
The quantity of what the sample constitutes25000 gal From where was the sample collectedSource
First name of sampler or witnessed byChris Last name of sampler or witnessed byNunes
Title of samplerUnknown Telephone number of samplerUnknown
Laboratory sample identificationUnknown Linked DIME Sample IDUnknown
The fabricator/manufacturer/facility namekwik Bond, Benecia Transportation Laboratory (TL) NumberSacramento Caltrans lab
Inspector Lot Number from the Transportation Laboratory (TL) FormUnknown Structure unique identifierNot set
Structure nameNot set

Material Information

Material TypeMethacrylate Mfg. Lot Number(s)1770389488
Batch number1770389488 Mix number1770389488

Test Details

DIME Sample ID: 2017-07-27-9
DIME Test ID: 2017-07-27-9-1
Testing Lab: CT HQ - Sacramento Concrete Testing Laboratory
Test Method: CONCLP 4-16: HMWM
Test Release Date: 2017-10-06

Test Results


Input Type: Measured
Tester's full name: Bang Nguyen
Date of test: 10/06/2017
Viscosity (ASTM D 2196) Brookfield RVT with UL adapter, 50 RPM @ 77 deg F, 25 max cps @ 77 deg F: 20 cps
Specific gravity (ASTM D 1475) 0.90 min @ 77 deg F: 1.09
Volatile content (ASTM D 2369) 30% max: 24 %
Flash point (ASTM D 3828) more than 180 deg F: 220 F
PCC - SSD bond strength (CA Test 551) 500 psi minimum @ 24 hours: 595 psi
Tack free time, 400 minutes max: 280 minutes
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 10/6/2017