Summary for Test 2017-06-01-9-6
Test performed: CTM 670-December 2013Project Information
Project Identifiers | Project ID: 209046 DEA: 120F96E4 EFIS: 1200020279 |
---|---|
DIST-CO-RTE-PM | 12-ORA-5,162-6.2/8.7 |
Award Date | 12/04/2013 |
Closeout Date | 01/09/2020 |
Work Description | CONSTRUCT HOV LANE. RECONSTRUCT RAMPS AND STRUCTURES WIDENING, |
Location Description | ORANGE COUNTY FROM 0.4 MILE NORTH OF CAMINO DE ESTRELLA OVERCROSSING TO 0.2 MILE SOUTH OF SAN JUAN CREEK ROAD UNDERCROSSING |
QA Service Level | 1 (Verified on 02/24/2014) |
Sample Information
Sample Taken Date | 06/01/2017 | Sample Unique Key | 9 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 06/07/2017 |
Sample type | Quality Assurance | A brief description of the sample | Couplers |
The quantity of what the sample constitutes | 12 | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Adam | Last name of sampler or witnessed by | Prieto |
Title of sampler | Unknown | Telephone number of sampler | Unknown |
Laboratory sample identification | Unknown | Linked DIME Sample ID | Unknown |
The fabricator/manufacturer/facility name | Gerdau Dayton Superior | Transportation Laboratory (TL) Number | C836753 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | NA | Structure unique identifier | Not set |
Structure name | Not set |
Material Information
Material Type | SMTL TM5 - Couplers | Production or Authorization Testing | Authorization Testing |
---|---|---|---|
Service or Ultimate | Service | Material Standard Code | ASTM A706 |
Material Grade | 60 | Rebar Manufacturer | Gerdau |
Coupler Manufacturer | Dayton Superior | Intermediate Assembler or Fabricator | Unknown |
Rebar Size | 4, 5, 11 | Coupler Model | Screwlok |
Coating Standards | Uncoated | Shape of Rebar | Straight |
Rebar Hoop Diameter | Unknown | Rebar Hoop Fabricator | Unknown |
Coupler Component Heat/Lot Number(s) | 74101369, MM16106575, 73101028 | Rebar Heat Number(s) | 65026106, 65026508, 65025236 |
Rebar Size 2 | Not set | Coupler Unique ID | Not set |
Test Details
DIME Sample ID: 2017-06-01-9
DIME Test ID: 2017-06-01-9-6
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Test Release Date: 2017-06-14
Test Results
Number of Samples: 1
Input Type: Measured
Tester's full name: Brian
Date of test: 06/07/2017
UTM: 75KIP
Halo ID: Small
Temperature: 72 F
Num | Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Slip (inch) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By |
---|---|---|---|---|---|---|---|---|---|
1 | 2 | #5/16mm | 0.31 | 0 | 31581 | 101870 | Service Splice | Brian |
General comments (publicly viewable) (Max 1000 characters): Service Splice
Test Graph
Source: Partner Data Point FileTest graph for the Sample
Test was verified on 6/7/2017 ✔