Summary for Test 2024-03-11-41-1
Test performed: CTM 231-March 2013Project Information
Project Identifiers | Project ID: 994591 DEA: 081J6704 EFIS: 0818000090 |
---|---|
DIST-CO-RTE-PM | 08-RIV-15-9.4/16.3 |
Award Date | 05/04/2023 |
Closeout Date | 11/04/2024 |
Work Description | MINOR CONCRETE, MODIFYING SIGNAL AND LIGHTING SYSTEMS, HMA AND JPCP. |
Location Description | RIVERSIDE COUNTY IN MURRIETA AND WILDOMAR AT VARIOUS LOCATIONS FROM 0.1 MILE SOUTH OF MURRIETA HOT SPRINGS ROAD OVERCROSSING TO BUNDY CANYON ROAD UNDERCROSSING. |
QA Service Level | 1 (Verified on 06/20/2023) |
Sample Information
Sample Taken Date | 03/11/2024 | Sample Unique Key | 41 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 03/11/2024 |
Sample type | Department Acceptance | A brief description of the sample | Subgrade |
The quantity of what the sample constitutes | 14.4 kg | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Mohammed | Last name of sampler or witnessed by | Haque |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | CTM 231 TEST LOCATION | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Soil | The fabricator's/manufacturer's product name for the sample | |
---|---|---|---|
The fabricator/manufacturer designation for the sample | A detailed description of where the material sample was collected | Bundy Canyon Rd to I-15 NB On-Ramp Sta 964+54.88 | |
Where the material sample would have been placed if not sampled |
Test Details
DIME Sample ID: 2024-03-11-41
DIME Test ID: 2024-03-11-41-1
Testing Lab: CT D08 - Fontana Field Testing Laboratory
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2024-04-05
Test Results
Method Type:: Standard Count
Number of Tests:: 3
Common Test Maximum Used:: No
Input Type: Calculated
Tester's full name: Mohammed Haque
Date of test: 03/11/2024
Sum of Count or Density: 2938 g/cc
Average of Count or Density: 979 g/cc
Sum of Moisture Count: 430 g/cc
Average of Moisture Count: 143 g/cc
Count Ratio Density: 0.56
Count Ratio Moisture: 0.22
Calculated Percent Relative Compaction: 93.5 %
Reported Percent Relative Compaction: 94 %
General comments (publicly viewable) (Max 1000 characters): Density Spec 95%
Test was verified on 4/5/2024 ✔