Summary for Test 2024-03-28-5-3

Test performed: AASHTO T176-08

Project Information

Project IdentifiersProject ID: 66669
DEA: JMF-DATA
EFIS: JMF-DATA
DIST-CO-RTE-PM59---
Award DateNot set
Closeout DateNot set
Work DescriptionSpecial project for storing JMF sample data
Location DescriptionNot set
QA Service LevelNOT VERIFIED

Sample Information

Sample Taken Date03/28/2024 Sample Unique Key5
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing03/28/2024
Sample typeQuality Control A brief description of the sampleBlended HMA Aggregate
The quantity of what the sample constitutesProduction From where was the sample collectedManufacturer
First name of sampler or witnessed byEric Last name of sampler or witnessed byGifford
Title of samplerNot set Telephone number of samplerNot set
Laboratory sample identificationNot set Linked DIME Sample IDNot set
The fabricator/manufacturer/facility nameTeichert Grantline Transportation Laboratory (TL) NumberNot set
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifierNot set
Structure nameNot set

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)91-34-0047
The fabricator's/manufacturer's product name for the sampleNot set The fabricator/manufacturer designation for the sampleNot set
The plant numberNot set A detailed description of where the material sample was collectedAsphalt Hot Plant
Where the material sample would have been placed if not sampledNot set Primary Aggregate Nominal Size1/2 inch
The concrete mix design number Lot numberNot set
Sublot numberNot set Aggregate Mix NumberNot set

Test Details

DIME Sample ID: 2024-03-28-5
DIME Test ID: 2024-03-28-5-3
Testing Lab: Teichert Materials - Sacramento
Test Method: AASHTO T176-08: Standard Method of Test for Plastic Fines in Graded Aggregates and Soils by Use of the Sand Equivalent Test (Sand Equivalent)
Test Release Date: 2024-03-28

Test Results


How many times will the test be run?: 3 Times
Input Type: Calculated
Tester's full name: Eric Gifford
Date of test: 03/28/2024
Sand Equivalent (Test 1): 68
Sand Equivalent (Test 2): 72
Sand Equivalent (Test 3): 70
Sand Equivalent: 70
General comments (publicly viewable) (Max 1000 characters): Submitted from JMF - Eric Gifford

Test was verified on 3/28/2024