Summary for Test 2024-03-08-32-1
Test performed: CTM 231-March 2013Project Information
Project Identifiers | Project ID: 214697 DEA: 07307104 EFIS: 0714000213 |
---|---|
DIST-CO-RTE-PM | 07-LA-101-32.8 |
Award Date | Not set |
Closeout Date | Not set |
Work Description | CONSTRUCT BRIDGE. |
Location Description | LOS ANGELES COUNTY IN AND NEAR AGOURA HILLS FROM 0.1 MILE WEST OF LIBERTY CANYON ROAD UNDERCROSSING TO 0.6 MILE EAST OF PALO COMADO OVERCROSSING |
QA Service Level | 1 (Verified on 07/12/2021) |
Sample Information
Sample Taken Date | 03/08/2024 | Sample Unique Key | 32 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 03/08/2024 |
Sample type | Department Acceptance | A brief description of the sample | Aggregate Base |
The quantity of what the sample constitutes | 500 cy | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Lou Ralph | Last name of sampler or witnessed by | Achuela |
Title of sampler | TET | Telephone number of sampler | 2138170504 |
Laboratory sample identification | 24-0401 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | C. A. Rasmussen, Inc. | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Soil | The fabricator's/manufacturer's product name for the sample | Aggregate Base |
---|---|---|---|
The fabricator/manufacturer designation for the sample | A detailed description of where the material sample was collected | From various locations at Aggregate Base | |
Where the material sample would have been placed if not sampled |
Test Details
DIME Sample ID: 2024-03-08-32
DIME Test ID: 2024-03-08-32-1
Testing Lab: CT D07 - Materials Field Laboratory, Unit 1953
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2024-03-25
Test Results
Method Type:: Standard Count
Number of Tests:: 3
Common Test Maximum Used:: No
Input Type: Measured
Tester's full name: Lou Ralph Achuela
Date of test: 03/08/2024
Gage No.: 31104
Test No.: 3
Nuclear By: Lou Ralph Achuela
Non-Bias Plan No.: 8
Depth: 12''
Material No.: On-Site
Material Type: Aggregate Base
Impact By: Lou Ralph Achuela
Standard Count Density: 2028 g/cc
Count or Density 1: 334 g/cc
Count or Density 2: 305 g/cc
Count or Density 3: 328 g/cc
Standard Count Moisture: 662 g/cc
Moisture Count 1: 152 g/cc
Moisture Count 2: 160 g/cc
Moisture Count 3: 176 g/cc
Sum of Count or Density: 967.00 g/cc
Average of Count or Density: 322.00 g/cc
Sum of Moisture Count: 488.00 g/cc
Average of Moisture Count: 163.00 g/cc
Count Ratio Density: 0.16
Count Ratio Moisture: 0.25
Calculated Percent Relative Compaction: 97.2 %
Reported Percent Relative Compaction: 97 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 3/25/2024 ✔