Summary for Test 2024-03-07-8-1
Test performed: CTM 556-January 2018Project Information
Project Identifiers | Project ID: 994532 DEA: 010E8904 EFIS: 0115000043 |
---|---|
DIST-CO-RTE-PM | 01-HUM, -101,299-88.3,0.0 |
Award Date | 04/20/2023 |
Closeout Date | Not set |
Work Description | Arcata 101 Merge Improvements |
Location Description | HUMBOLDT COUNTY IN ARCATA AT ROUTE 299/101 SEPARATION |
QA Service Level | 1 (Verified on 04/25/2023) |
Sample Information
Sample Taken Date | 03/07/2024 | Sample Unique Key | 8 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 03/08/2024 |
Sample type | Department Acceptance | A brief description of the sample | Type II/V Portland Cement |
The quantity of what the sample constitutes | 3 4x8 concrete cylinders | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Adlai | Last name of sampler or witnessed by | Evans |
Title of sampler | ASR | Telephone number of sampler | 9513253144 |
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Eureka Ready mix | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | 12-04E0047 | |
Structure name |
Material Information
Material Type | Concrete | The concrete mix design number | E350F |
---|---|---|---|
The truck number from where the sample was collected | 84 | The batch plant ticket number from where the sample was collected | 34635 |
Concrete batch plant | Arcata Eureka Ready Mix | The fabricator/manufacturer designation for the sample | |
A detailed description of where the material sample was collected | Chute from truck | Where the material sample would have been placed if not sampled | Barrier slab |
From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2024-03-07-8
DIME Test ID: 2024-03-07-8-1
Testing Lab: CT D01 - Boyd Road Field Laboratory
Test Method: CTM 556-January 2018: Method of Test for Slump of Fresh Portland Cement Concrete
Test Release Date: 2024-03-08
Test Results
Input Type: Calculated
Tester's full name: Adlai Evens
Date of test: 03/07/2024
Slump: 6.5 inch
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 3/8/2024 ✔