Summary for Test 2023-11-01-130-1
Test performed: AASHTO T336-15Project Information
Project Identifiers | Project ID: 214627 DEA: 05344904 EFIS: 0500000505 |
---|---|
DIST-CO-RTE-PM | 05-SBT-156-3/R8.2 |
Award Date | 05/19/2022 |
Closeout Date | Not set |
Work Description | SAN BENITO ROUTE 156 IMPROVEMENT PROJECT SAN BENITO RTE 156 IMPROVEMENT PROJECT; INCLUDES NEW BRIDGE AND WIDENING OF EXISTING BRIDGE. |
Location Description | SAN BENITO COUNTY IN AND NEAR SAN JUAN BAUTISTA FROM THE ALAMEDA TO 0.2 MILE EAST OF FOURTH STREET/BUSINESS ROUTE 156 |
QA Service Level | 1 (Verified on 01/14/2020) |
Sample Information
Sample Taken Date | 11/01/2023 | Sample Unique Key | 130 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | No | Date that the sample was received by the laboratory/organization performing the testing | 12/07/2023 |
Sample type | Authorization | A brief description of the sample | 4" Dia. Concrete Cyl. |
The quantity of what the sample constitutes | Mix Design | From where was the sample collected | Supplier |
First name of sampler or witnessed by | Anthony | Last name of sampler or witnessed by | Romiza |
Title of sampler | TET B | Telephone number of sampler | |
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Teichert | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Concrete | The concrete mix design number | 58LCB1454 |
---|---|---|---|
The truck number from where the sample was collected | The batch plant ticket number from where the sample was collected | na | |
Concrete batch plant | The fabricator/manufacturer designation for the sample | 58LCB1454-1 | |
A detailed description of where the material sample was collected | bulk | Where the material sample would have been placed if not sampled | |
From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2023-11-01-130
DIME Test ID: 2023-11-01-130-1
Testing Lab: Wood
Test Method: AASHTO T336-15: Standard Method of Test for Coefficient of Thermal Expansion of Hydraulic Cement Concrete
Test Release Date: 2024-02-05
Test Results
Input Type: Calculated
Tester's full name: Michael Gibson
Date of test: 12/19/2023
Average CTE: 3.05 mm/mm/°C
Average CTE: 5.5 in/in/°F
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 2/5/2024 ✔