Summary for Test 2023-05-10-99-1
Test performed: AASHTO T308-10
Warning: The test results shown on this page have been superseded and are invalid.
This information is for reference only.
Please click this
link
to view the corrected test.
Project Information
Project Identifiers | Project ID: 993333 DEA: 04264724 EFIS: 0419000068 |
---|---|
DIST-CO-RTE-PM | 04-MRN-101-R20.8/27.1 |
Award Date | 04/26/2022 |
Closeout Date | Not set |
Work Description | CIP BRIDGES, CONSTRUCT ROADWAY, RETAINING WALLS AND MODIFY ELECTRICAL. |
Location Description | MARIN COUNTY IN AND NEAR NOVATO FROM 0.1 MILE SOUTH OF FRANKLIN AVENUE OVERHEAD TO 0.5 MILE SOUTH OF SAN ANTONIO CREEK BRIDGE |
QA Service Level | 1 (Verified on 11/01/2021) |
Sample Information
Sample Taken Date | 05/10/2023 | Sample Unique Key | 99 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 05/11/2023 |
Sample type | Quality Assurance | A brief description of the sample | HMA |
The quantity of what the sample constitutes | 4 BOXES | From where was the sample collected | Manufacturer |
First name of sampler or witnessed by | Anthony | Last name of sampler or witnessed by | Valdez |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Dutra Materials Richmond | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Hot Mix Asphalt | HMA Type | Type A HMA |
---|---|---|---|
HMA Grading | 3/4 inch | Lot number | 1 |
Sublot number | 11 | HMA Mix Number | l |
Test Details
DIME Sample ID: 2023-05-10-99
DIME Test ID: 2023-05-10-99-1
Testing Lab: CT D04 - Petaluma Field Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2024-02-01
Test Results
What temperature unit is used?: Celsius
Input Type: Measured
Tester's full name: Anthony Valdez
Date of test: 05/11/2023
Test procedure used?: Method A
Mass of the specimen basket assembly: 3232.4 g
Mass of the specimen and specimen basket assembly prior to ignition: 4839.4 g
Mass of HMA Sample prior to ignition: 1607.0 g
Mass Loss: 105.6 g
Mass of aggregate remaining after ignition: 1501.4 g
Correction Factor (Percent by mass of HMA Specimen): 1.01 %
Moisture Content: 0.00 %
Temperature Compensation Factor: 0.19 %
Test Temperature: 482 C
Corrected Asphalt Binder Content: 5.37 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 2/1/2024 ✔
Warning: The test results shown on this page have been superseded and are invalid.
This information is for reference only.