Summary for Test 2024-01-12-13-1
Test performed: CTM 216-June 2011Project Information
Project Identifiers | Project ID: 994214 DEA: 07337904 EFIS: 0717000052 |
---|---|
DIST-CO-RTE-PM | 07-LA-2,10,101,134-Var |
Award Date | 11/07/2022 |
Closeout Date | Not set |
Work Description | MODIFY CAMERA, MESSAGE SIGN & RM SYSTEMS, & REPLACE SIGN STRUCTURES. |
Location Description | IN LOS ANGELES COUNTY AT VARIOUS LOCATIONS. |
QA Service Level | 1 (Verified on 09/20/2022) |
Sample Information
Sample Taken Date | 01/12/2024 | Sample Unique Key | 13 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 01/12/2024 |
Sample type | Acceptance | A brief description of the sample | Class 3 Aggregate Base |
The quantity of what the sample constitutes | 1358 sqft | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Chad | Last name of sampler or witnessed by | Chotibhongs |
Title of sampler | MREA | Telephone number of sampler | 2134076963 |
Laboratory sample identification | 24-0142 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | NA | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | NA |
---|---|---|---|
The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
The plant number | A detailed description of where the material sample was collected | CTM 231 Test Holes | |
Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | 3/4 inch | |
The concrete mix design number | Lot number | ||
Sublot number | Aggregate Mix Number |
Test Details
DIME Sample ID: 2024-01-12-13
DIME Test ID: 2024-01-12-13-1
Testing Lab: CT D07 - Materials Field Laboratory, Unit 1953
Test Method: CTM 216-June 2011: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates
Test Release Date: 2024-01-12
Test Results
Is oversize material: No
Input Type: Measured
Tester's full name: Chad Chotibhongs
Date of test: 01/12/2024
In-place wet density: 2.19
Highest adjust wet density: 2.3
% Moisture: 4.6 %
Optimum Moisture: 8.6 %
Relative compaction: 95
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 1/12/2024 ✔