Summary for Test 2023-12-11-10-3

Test performed: AASHTO T269-14

Project Information

Project IdentifiersProject ID: 215348
DEA: 060U4204
EFIS: 0616000004
DIST-CO-RTE-PM06-FRE-99-R4.9/11.6
Award Date02/25/2021
Closeout DateNot set
Work DescriptionCONSTRUCT CRCP, PLACE HMA, AND ROADWAY EXCAVATION.
Location DescriptionFRESNO COUNTY IN AND NEAR SELMA AND FOWLER FROM MCCALL AVENUE UNDERCROSSING TO 0.5 MILE NORTH OF MERCED STREET UNDERCROSSING
QA Service Level1 (Verified on 12/07/2020)

Sample Information

Sample Taken Date12/11/2023 Sample Unique Key10
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing12/11/2023
Sample typeDepartment Acceptance A brief description of the sample3/4" HMA coldfeed
The quantity of what the sample constitutes449 T From where was the sample collectedManufacturer
First name of sampler or witnessed byArthur Last name of sampler or witnessed byMills
Title of sampler Telephone number of sampler8033087727
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameVulcan Ashlan Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeHot Mix Asphalt HMA TypeType A HMA
HMA Grading3/4 inch Lot number16
Sublot number1 HMA Mix Number

Test Details

DIME Sample ID: 2023-12-11-10
DIME Test ID: 2023-12-11-10-3
Testing Lab: CT D06 - Millbrook Field Laboratory
Test Method: AASHTO T269-14: Standard Method of Test for Percent Air Voids in Compacted Dense and Open Asphalt Mixtures (Air Void)
Test Release Date: 2023-12-18

Test Results


Number of tests: 1
Input Type: Measured
Tester's full name: Tomas Silva
Date of test: 12/13/2023
123
2.544
2.594

1.9 %
General comments (publicly viewable) (Max 1000 characters): This result is from the D.O. lab

Test was verified on 12/18/2023