Summary for Test 2023-07-24-113-1
Test performed: AASHTO T308-10Project Information
Project Identifiers | Project ID: 994386 DEA: 023J7404 EFIS: 0222000079 |
---|---|
DIST-CO-RTE-PM | 02-LAS-395-92.0/98.5 |
Award Date | 01/04/2023 |
Closeout Date | 04/11/2024 |
Work Description | HMA OVERLAY, REPLACE AC SURFACING AND RECESSED THERMOPLASTIC STRIPE. |
Location Description | LASSEN COUNTY ABOUT 16 MILES SOUTH OF RAVENDALE FROM 0.1 MILE NORTH OF KARLO ROAD TO 1.5 MILES SOUTH OF RAMHORN ROAD |
QA Service Level | 1 (Verified on 03/28/2023) |
Sample Information
Sample Taken Date | 07/24/2023 | Sample Unique Key | 113 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 07/18/2023 |
Sample type | Production Start-Up | A brief description of the sample | 16 boxes of Lime Treated 1/2-inch Type A HMA (eq. PG 64-28 M) with 25.0% RAP Aggregate and virgin PG 58-34 M from Albina (Klamath Falls, OR) |
The quantity of what the sample constitutes | Production Start-Up Evaluation | From where was the sample collected | Manufacturer |
First name of sampler or witnessed by | Dawn | Last name of sampler or witnessed by | Sloaterman |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | D79303 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | Hat Creek Construction and Materials - Ward Lake Plant (Litchfield, CA) | Transportation Laboratory (TL) Number | 858037 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Hot Mix Asphalt | HMA Type | Type A HMA |
---|---|---|---|
HMA Grading | 1/2 inch | Lot number | |
Sublot number | HMA Mix Number | JMF3513 2023 14 |
Test Details
DIME Sample ID: 2023-07-24-113
DIME Test ID: 2023-07-24-113-1
Testing Lab: CT D02 - Redding Northern Regional Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2023-12-18
Test Results
What temperature unit is used?: Celsius
Input Type: Measured
Tester's full name: Terry McCormick
Date of test: 08/14/2023
Test procedure used?: Method A
Mass of the specimen basket assembly: 3109.6 g
Mass of the specimen and specimen basket assembly prior to ignition: 4612.5 g
Mass of HMA Sample prior to ignition: 1502.9 g
Mass Loss: 103.0 g
Mass of aggregate remaining after ignition: 1399.9 g
Correction Factor (Percent by mass of HMA Specimen): 0.56 %
Moisture Content: 0.00 %
Temperature Compensation Factor: 0.20 %
Test Temperature: 538 C
Corrected Asphalt Binder Content: 6.09 %
General comments (publicly viewable) (Max 1000 characters): Pb=6.09%
Test was verified on 12/18/2023 ✔