Summary for Test 2023-12-13-8-1
Test performed: CTM 216-June 2011Project Information
Project Identifiers | Project ID: 995361 DEA: 072XF604 EFIS: 0723000126 |
---|---|
DIST-CO-RTE-PM | 07-VEN-33-24.25/27.3 |
Award Date | 03/01/2023 |
Closeout Date | Not set |
Work Description | Rebuild the eroded side slopes, rebuild the damaged shoulders, reconstruct the dike, repair the sinkhole on the shoulder, repair the eroded areas next to EP, behind guardrail, and around the flumes, reinstall guardrail, rebuild RSP, clean the drainage systems, construct a SPW |
Location Description | Not set |
QA Service Level | 1 (Verified on 11/27/2023) |
Sample Information
Sample Taken Date | 12/13/2023 | Sample Unique Key | 8 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 12/13/2023 |
Sample type | Department Acceptance | A brief description of the sample | Aggregate Base |
The quantity of what the sample constitutes | 1200sqft | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Chad | Last name of sampler or witnessed by | Chotibhongs |
Title of sampler | MREA | Telephone number of sampler | 2134076963 |
Laboratory sample identification | 23-2201 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | Granite | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | NA |
---|---|---|---|
The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
The plant number | A detailed description of where the material sample was collected | CTM 231 Test Holes | |
Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | 3/4 inch | |
The concrete mix design number | Lot number | ||
Sublot number | Aggregate Mix Number |
Test Details
DIME Sample ID: 2023-12-13-8
DIME Test ID: 2023-12-13-8-1
Testing Lab: CT D07 - Materials Field Laboratory, Unit 1953
Test Method: CTM 216-June 2011: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates
Test Release Date: 2023-12-13
Test Results
Is oversize material: No
Input Type: Measured
Tester's full name: Chad Chotibhongs
Date of test: 12/13/2023
In-place wet density: 2.13
Highest adjust wet density: 2.21
% Moisture: 11.7 %
Optimum Moisture: 9.7 %
Relative compaction: 96
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 12/13/2023 ✔