Summary for Test 2023-10-19-76-1
Test performed: AASHTO T308-10Project Information
Project Identifiers | Project ID: 994615 DEA: 112N1644 EFIS: 1122000151 |
---|---|
DIST-CO-RTE-PM | 11-IMP-8-R3.7/R48.0 |
Award Date | 05/19/2023 |
Closeout Date | 06/11/2024 |
Work Description | MICROSURFACING, COLD PLANE, RHMA, PAVEMENT MARKING, & CENSUS SYSTEMS. |
Location Description | IMPERIAL COUNTY AT VARIOUS LOCATIONS FROM 0.7 MILE EAST OF MOUNTAIN SPRINGS ROAD UNDERCROSSING TO 0.2 MILE EAST OF ROUTE 7/8 SEPARATION |
QA Service Level | 1 (Verified on 06/04/2024) |
Sample Information
Sample Taken Date | 10/19/2023 | Sample Unique Key | 76 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 10/20/2023 |
Sample type | Quality Assurance | A brief description of the sample | 1/2" RHMA-G |
The quantity of what the sample constitutes | 4 boxes 4 bags | From where was the sample collected | Source |
First name of sampler or witnessed by | Joe | Last name of sampler or witnessed by | Loper |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | 9813-A | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | API Gateway | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Hot Mix Asphalt | HMA Type | RHMA-G |
---|---|---|---|
HMA Grading | 1/2 inch | Lot number | 1 |
Sublot number | 12 | HMA Mix Number | 1 |
Combined Gradation Report Information
Combined Gradation Report Id | Bin Index | Dime Test Id |
---|---|---|
No assigned tests for this sample. |
Test Details
DIME Sample ID: 2023-10-19-76
DIME Test ID: 2023-10-19-76-1
Testing Lab: CT D11 - District 11 Materials Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2024-03-20
Test Results
What temperature unit is used?: Celsius
Input Type: Measured
Tester's full name: Daniel Smith / J Seymour
Date of test: 12/12/2023
Test procedure used?: Method A
Mass of the specimen basket assembly: 3883.2 g
Mass of the specimen and specimen basket assembly prior to ignition: 5415.9 g
Mass of HMA Sample prior to ignition: 1532.7 g
Mass Loss: 115.2 g
Mass of aggregate remaining after ignition: 1417.5 g
Correction Factor (Percent by mass of HMA Specimen): 0.08 %
Moisture Content: 0.00 %
Temperature Compensation Factor: 0.00 %
Test Temperature: 538 C
Corrected Asphalt Binder Content: 7.44 %
General comments (publicly viewable) (Max 1000 characters): Complies Target - 7.50% -.4 or +.5 / Result 7.44%
Test was verified on 3/20/2024 ✔