Summary for Test 2023-11-06-9-3
Test performed: CTM 670-December 2013Project Information
Project Identifiers | Project ID: 994326 DEA: 051C3604 EFIS: 0512000134 |
---|---|
DIST-CO-RTE-PM | 05-SB-217-0.9/1.4 |
Award Date | 01/31/2023 |
Closeout Date | Not set |
Work Description | REPLACE BRIDGE. |
Location Description | SANTA BARBARA COUNTY NEAR GOLETA FROM 0.2 MILE EAST OF GOLETA SLOUGH BRIDGE TO 0.4 MILE EAST OF SAN JOSE CREEK BRIDGE |
QA Service Level | 1 (Verified on 10/17/2022) |
Sample Information
Sample Taken Date | 11/06/2023 | Sample Unique Key | 9 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 11/07/2023 |
Sample type | Quality Assurance | A brief description of the sample | #8 bar HRC 500-510 Couplers |
The quantity of what the sample constitutes | 4 Couplers from 150 | From where was the sample collected | Fabricator |
First name of sampler or witnessed by | Osiell | Last name of sampler or witnessed by | Ramirez |
Title of sampler | Quality Assurance Inspector | Telephone number of sampler | (916) 767-3535 |
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Integrity Rebar Placers | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | L123-099-23 | Structure unique identifier | |
Structure name |
Material Information
Material Type | SMTL TM5 - Couplers | Production or Authorization Testing | Production Testing |
---|---|---|---|
Service or Ultimate | Ultimate | Material Standard Code | ASTM A706 |
Material Grade | 60 | Rebar Manufacturer | Vinton Steel |
Coupler Manufacturer | HRC Fountian Valley CA | Intermediate Assembler or Fabricator | Integrity Rebar Placers |
Rebar Size | #8 | Coupler Model | HRC 500/510 |
Coating Standards | Uncoated | Shape of Rebar | Straight |
Rebar Hoop Diameter | Rebar Hoop Fabricator | ||
Coupler Component Heat/Lot Number(s) | 5395277/5395277 | Rebar Heat Number(s) | 2321443 |
Rebar Size 2 | 8 | Coupler Unique ID | TP-17-03 |
Test Details
DIME Sample ID: 2023-11-06-9
DIME Test ID: 2023-11-06-9-3
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Test Release Date: 2023-11-09
Test Results
Number of Samples Tested: 1
Input Type: Measured
Tester's full name: rmacias
Date of test: 11/08/2023
UTM: 400kip
Temperature: 72.00 f
Halo ID:
Num | Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Slip (inch) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By |
---|---|---|---|---|---|---|---|---|---|---|
1 | 3 | No. 8/25mm | 2 | 0 | 0.79 | 73827 | 93451 | Ok Necking | rmacias |
General comments (publicly viewable) (Max 1000 characters): Ok Necking
Test Graph
Source: Bluehill Data Point File
WARNING: position or load not found in data points imported from Instron machine.
Test was verified on 11/9/2023 ✔