Test performed: CTM 342-August 2012Project Information
Project Identifiers | Project ID: 215129 DEA: 050N73U4 EFIS: 0520000166 |
---|---|
DIST-CO-RTE-PM | 05-SB-101-7.3/9.6 |
Award Date | 10/23/2020 |
Closeout Date | Not set |
Work Description | !!Please CC Office Engineer Gabrielle Herrera on reports to RE and SR!! Segment 4C - Summerland: Construct HOV lanes and rehabilitation. Source inspection of sign structure trusses, lighting structures, steel soldier piles, epoxy coated rebar, |
Location Description | SUMMERLAND FROM 0.2 MILES NORTH OF PARDARO LANE OVERCROSSING TO SAN YSIDRO CREEK BRIDGE |
QA Service Level | 1 (Verified on 08/24/2020) |
Sample Information
Sample Taken Date | 09/26/2023 | Sample Unique Key | 46 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 09/26/2023 |
Sample type | Acceptance | A brief description of the sample | PCC |
The quantity of what the sample constitutes | MAINLINE | From where was the sample collected | Job Site |
First name of sampler or witnessed by | HARISH | Last name of sampler or witnessed by | THAKUR |
Title of sampler | Telephone number of sampler | 9152961873 | |
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | JOB SITE | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Roadway/Bridge Surface | Pavement Surface Type | Not set |
---|---|---|---|
Type of Traffic Control Provided | Not set | DIST-CO-RTE | Not set |
Direction of Travel | Not set | Post Mile | Not set |
Lanes to be Tested | Not set | Station | Not set |
Test Details
DIME Sample ID: 2023-09-26-46
DIME Test ID: 2023-09-26-46-11
Testing Lab: CT HQ - FFS - Skid Testing
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Test Release Date: 2023-11-06
Test Results
Pavement or Bridge Deck?: Pavement
Input Type: Measured
Tester's full name: Harish Thakur
Date of test: 10/30/2023
Air Temperature: 57
Tire Pressure: 25
Equipment PST #: 1000-7/1000-8
Is Calibration within ± values: Yes
Weather: NIGHT/WARM
Direction/Lane #: SB: Southbound Direction of Travel
Edge used to measure reference distance: ROADWAY
Edge used to measure position: LEFT OF WALL
Project Stationing 1: 100+00
Project Stationing 2: 100+25
Project Stationing 3: 100+50
Project Stationing 4: 100+75 ft
Project Stationing 5: 200+00 ft
Direction and Lane # for Stationing 1: no data
Direction and Lane # for Stationing 2: no data
Direction and Lane # for Stationing 3: no data
Direction and Lane # for Stationing 4: no data
Direction and Lane # for Stationing 5: no data
Position for Stationing 1: 25
Position for Stationing 2: 25
Position for Stationing 3: 25
Position for Stationing 4: 25 ft
Position for Stationing 5: 25 ft
Percent Grade for 1st Stationing: -2.0
Percent Grade for 2nd Stationing: -2.0
Percent Grade for 3rd Stationing: -2.0
Percent Grade for 4th Stationing: -2.0 %
Percent Grade for 5th Stationing: -2.0 %
Corrected Coefficients of Friction for Stationing 1: 0.39
Corrected Coefficients of Friction for Stationing 2: 0.39
Corrected Coefficients of Friction for Stationing 3: 0.39
Corrected Coefficients of Friction for Stationing 4: 0.39
Corrected Coefficients of Friction for Stationing 5: 0.39
Average Coefficient of Friction: 0.39
General comments (publicly viewable) (Max 1000 characters): SB101 LANE 3/1. TESTED AT VARIOUS RANDOM SPOTS ABOUT .5 MILES LONG STRETCH
Test was verified on 11/6/2023 ✔