Summary for Test 2023-10-05-10-2
Test performed: ASTM C143-20Project Information
Project Identifiers | Project ID: 215753 DEA: 050N72U4 EFIS: 0520000169 |
---|---|
DIST-CO-RTE-PM | 05-SB-101-4.4/R7.7 |
Award Date | 03/01/2021 |
Closeout Date | Not set |
Work Description | Please cc Office Engineer Ni Nyoman Paul on reports sent to RE and SR. Construct High Occupancy Vehicle (HOV) lanes on U.S. Route 101 and rehabilitation - Segment 4B. |
Location Description | 101 freeway in Summerland, CA |
QA Service Level | 1 (Verified on 05/06/2021) |
Sample Information
Sample Taken Date | 10/05/2023 | Sample Unique Key | 10 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 10/05/2023 |
Sample type | Quality Assurance | A brief description of the sample | Concrete Test Samples |
The quantity of what the sample constitutes | 12 Cy | From where was the sample collected | Supplier |
First name of sampler or witnessed by | Mike | Last name of sampler or witnessed by | Bennett |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Calportland Lompoc | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Concrete | The concrete mix design number | 710RH1010S |
---|---|---|---|
The truck number from where the sample was collected | The batch plant ticket number from where the sample was collected | 1910419 | |
Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
A detailed description of where the material sample was collected | Discharge from concrete truck into wheelbarrow | Where the material sample would have been placed if not sampled | |
From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2023-10-05-10
DIME Test ID: 2023-10-05-10-2
Testing Lab: CT D05 - Carpinteria Field Laboratory
Test Method: ASTM C143-20: Standard Test Method for Slump of Hydraulic-Cement Concrete
Test Release Date: 2023-10-05
Test Results
Input Type: Calculated
Tester's full name: tom cromwell
Date of test: 10/05/2023
Slump: 4.25 inch
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 10/5/2023 ✔