Summary for Test 2023-09-22-42-3

Test performed: AASHTO T49-15

Project Information

Project IdentifiersProject ID: 55555
DEA: AMRL
EFIS: AMRL
DIST-CO-RTE-PM59---
Award DateNot set
Closeout DateNot set
Work DescriptionSpecial project for submitting Sample information for AASHTO Materials Reference Laboratory (AMRL).
Location DescriptionNot set
QA Service LevelNOT VERIFIED

Sample Information

Sample Taken Date09/22/2023 Sample Unique Key42
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing09/22/2023
Sample typeProficiency A brief description of the sampleSample 80 (B)
The quantity of what the sample constitutesPSP sample emulsified From where was the sample collectedOther
First name of sampler or witnessed byAASHTO resource Last name of sampler or witnessed byAASHTO resource
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameAASHTO resource Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeAsphaltic Emulsion Emulsion GradeSS-1h
Lot NumberNot set Sub LotNot set

Test Details

DIME Sample ID: 2023-09-22-42
DIME Test ID: 2023-09-22-42-3
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: AASHTO T49-15: Standard Method of Test for Penetration of Bituminous Materials
Test Release Date: 2023-09-28

Test Results


Input Type: Measured
Tester's full name: Juan Gomez
Date of test: 09/28/2023
Was test performed on residue from distillation or evaporation?: Distillation
Temperature (C): 25 C
Load (grams): 50 grams
Time (sec): 5 second
Penetration A: 68 dmm
Penetration B: 67 dmm
Penetration C: 68 dmm
Average Penetration: 68 dmm
General comments (publicly viewable) (Max 1000 characters): Pen. of Distillation Residue

Test was verified on 9/28/2023